My WebLink
|
Help
|
About
|
Sign Out
_Agenda_Packet_080326
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
BICYCLE PEDESTRIAN AND TRAILS
>
AGENDA PACKETS
>
2026
>
080326
>
_Agenda_Packet_080326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2026 3:23:28 PM
Creation date
9/24/2026 3:22:41 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/3/2026
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Prioritization and Implementation of Proposed Recommendations <br />for the Pleasanton Bicycle and Pedestrian Master Plan Update July 21, 2026 <br /> <br />P a g e | 10 <br /> <br />corridor ranking identifies corridors with the greatest overall performance based on the <br />evaluation criteria and community support, the implementation categories also consider <br />opportunities to advance projects already underway, complete network gaps, and deliver near - <br />term safety and connectivity benefits. <br />Priority Corridors <br />Priority Corridors represent the highest implementation priorities for the City and should be the <br />focus of near-term planning, design, funding, and construction efforts. These corridors either <br />ranked highest in the prioritization evaluation or are already being advanced through ongoing <br />City initiatives. <br /> <br />The priority corridors include: <br /> <br />• #1 Main Street / Old Bernal Avenue–Peters Avenue–St. John Street <br />• #2 Santa Rita Road <br />• #3 Valley Avenue <br />• #4 Spring Avenue/Kottinger Drive <br />• #5 Bernal Avenue <br />• #9 West Las Positas Boulevard * <br /> <br />*Although West Las Positas Boulevard ranked ninth overall, it is included as a Priority Corridor <br />because the City is actively advancing improvements to complete the remaining gaps in the <br />corridor and build upon recently implemented bicycle and pedestrian im provements. <br />Major Capital Corridors <br />Major Capital Corridors are important citywide and regional connections that require substantial <br />infrastructure investment and complex implementation. Due to their scale and cost, these <br />corridors are best advanced through phased planning and design, coordination with partner <br />agencies, and pursuit of competitive regional, state, and federal funding opportunities. While <br />these corridors ranked lower than th e Priority Corridors, they remain important long -term <br />investments for improving the city's multimodal transportation network. <br /> <br />Major Capital Corridors include: <br /> <br />• #10 Foothill Road <br />• #11 Stoneridge Drive <br />• #12 Hopyard Road <br />• #14 Willow Road <br />• #15 Iron Horse Trail Extension <br />Opportunity Corridors <br />Opportunity Corridors represent corridors where improvements can be advanced through <br />smaller-scale capital projects, routine maintenance, development -related improvements, or <br />other opportunistic funding sources. While these corridors may not require the le vel of <br />investment needed for the Priority or Major Capital Corridors, they can provide meaningful near - <br />term safety and connectivity benefits and help expand the City's low -stress bicycle and <br />pedestrian network as opportunities arise. <br /> <br />Opportunity corridors include:
The URL can be used to link to this page
Your browser does not support the video tag.