Laserfiche WebLink
94 | 2026 PLEASANTON BICYCLE AND PEDESTRIAN MASTER PLAN <br />IMPLEMENTATION <br />The highest-ranked corridors (#1 to #9) are discussed in greater detail below to provide additional context on the factors contributing <br />to their rankings:. <br />• #1 Main Street between Del Valle Parkway and Old Bernal Avenue: Main Street ranked as the highest-scoring corridor due to <br />its Downtown location, access to schools and key destinations, equity considerations, and strong community support. Bicycle <br />improvements along Main Street are constrained by existing roadway conditions; therefore, the recommended alternate low- <br />stress bicycle route through Downtown follows the parallel Old Bernal Avenue–Peters Avenue–St. John Street corridor. The <br />Main Street-Old Bernal Avenue–Peters Avenue–St. John Street bicycle improvements ranked among the top five bicycle proj- <br />ects and the Main Street/Division Street intersection improvements ranked among the top five pedestrian improvement proj- <br />ects. <br />• #2 Santa Rita Road between I-580 and Del Valle Parkway: Santa Rita Road ranked as the second-highest-scoring corridor due <br />to its role as a major north-south connection, access to schools and regional destinations, location on the bike/ped focused <br />high injury corridor network, equity considerations, and strong community support. The low-stress bicycle facility recommend- <br />ed along the corridor ranked among the top five bicycle improvement projects and the pedestrian crossing improvements at <br />the Santa Rita Road/Black Avenue intersection ranked among the top five pedestrian improvement projects. Due to the corr- <br />dor’s scale and construction complexity, improvements would require phased implementation and grant funding. <br />• #3 Valley Avenue between Hopyard Road and Stanley Boulevard: Valley Avenue ranked as the third-highest-scoring corridor <br />due to its access to schools and neighborhoods, connection to the Iron Horse Trail, location on the bike/ped focused high injury <br />corridor network, and equity considerations. Although it received moderate community support, it serves as an important east- <br />west connection through central Pleasanton.. <br />• #4 Spring Avenue/Kottinger Drive between Main Street and Concord Street: Spring Avenue/Kottinger Drive ranked among <br />the highest-scoring corridors due to its connection to Downtown Pleasanton, access to schools, and equity considerations. <br />Although it received moderate community support, it serves as an important connection to the eastside neighborhoods. The <br />Spring Avenue/Kottinger Drive and Bernal Avenue intersection also ranked among the top five pedestrian improvement proj- <br />ects. <br />• #5 Bernal Avenue between Foothill Road and First Stree: Bernal Avenue ranked among the highest-scoring corridors since it <br />is the only I-680 crossing on the south side of Pleasanton connecting residential neighborhoods west of I-680 to Downtown. <br />It is also located on the bike/ped focused high injury corridor network, is proximate to schools, has moderate implementation <br />cost, and received strong community support. Three intersections—Bernal Avenue/Kottinger Drive, Bernal Avenue/Sunol Bou- <br />levard, and Bernal Avenue/Pleasanton Avenue—ranked among the top five pedestrian improvement projects. <br />• #6 Black Avenue between Hopyard Road and Santa Rita Road: Black Avenue ranked among the higher-scoring corridors due <br />to its neighborhood connectivity, access to schools, and relatively low implementation cost. The corridor received moderate <br />community support. The Santa Rita Road/Black Avenue intersection ranked among the top five pedestrian improvement proj- <br />ects.