My WebLink
|
Help
|
About
|
Sign Out
_Agenda_Packet_092826
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
BICYCLE PEDESTRIAN AND TRAILS
>
AGENDA PACKETS
>
2026
>
092826
>
_Agenda_Packet_092826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2026 3:28:31 PM
Creation date
9/24/2026 3:25:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/28/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2026 PLEASANTON BICYCLE AND PEDESTRIAN MASTER PLAN | 95 <br />IMPLEMENTATION <br />• #7 Case Avenue between Bernal Avenue and Valley Avenue: Case Avenue ranked among the higher scoring corridors based <br />on its access to two schools, Downtown, and potential to improve bicycle facility comfort. The corridor has an existing south- <br />bound Class IV separated bikeway along the school frontages. The Plan recommends converting the existing northbound <br />Class II bicycle lane to a Class IV separated bikeway. During the walk audit, students accessing the schools were observed en- <br />tering the southbound Class IV separated bikeway along the school frontages and traveling in the wrong direction; a separated <br />facility on the opposite side of the roadway could help address this behavior. The corridor received lower community support, <br />likely due to the existing low stress bicycle facility along the school frontages. <br />• #8 Greenwood Road/Harvest Road between Mohr Avenue and Del Valle Parkway: Greenwood Road/Harvest Road ranked <br />among the higher scoring corridors due to its access to schools, neighborhood connectivity, and relatively low implementa- <br />tion cost. The corridor received lower community support. The crossing improvements at the Greenwood Road/Valley Avenue <br />intersection ranked high (#6) in pedestrian improvements <br />• #9 W Las Positas Boulevard between Foothill Road and Cranwood Court): West Las Positas Boulevard ranked lower in this <br />Plan than in the 2018 Bicycle and Pedestrian Master Plan, where it was identified as the highest-priority corridor. This change <br />reflects updates to the prioritization methodology, including greater emphasis on connections to major bicycle and pedestrian <br />destinations, traffic stress levels, and equity considerations. In addition, recently completed improvements between 550 feet <br />west of Payne Road and Hacienda Drive—including intersection enhancements and a quickbuild Class IV separated bikeway— <br />have reduced traffic stress and improved walking and bicycling conditions along this portion of the corridor. <br /> <br />Despite its lower overall ranking, West Las Positas Boulevard remains a critical eastwest connection on the north side of the <br />city, providing an I-680 crossing and linking neighborhoods with schools and other key destinations. It is located on the bi- <br />cycle focused high injury corridor, and the unimproved segments between Foothill Road and 550 feet west of Payne Road <br />and between Hacienda Drive and Cranwood Court tied at ranking #6 among the bicycle segment improvements, indicating a <br />continued need for additional investment. While community support for converting the existing quick-build separated bikeway <br />to a permanent facility was low compared to corridors without existing low-stress facilities, the corridor overall received strong <br />community support, underscoring its continued importance as a multimodal corridor.
The URL can be used to link to this page
Your browser does not support the video tag.