My WebLink
|
Help
|
About
|
Sign Out
_Agenda_Packet_092826
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
BICYCLE PEDESTRIAN AND TRAILS
>
AGENDA PACKETS
>
2026
>
092826
>
_Agenda_Packet_092826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2026 3:28:31 PM
Creation date
9/24/2026 3:25:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/28/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2026 PLEASANTON BICYCLE AND PEDESTRIAN MASTER PLAN | 15 <br />INTRODUCTION <br />Community-Driven Planning Process <br />The Plan was developed through a collaborative process that combined technical analysis with extensive community engagement. <br />Throughout the planning process, residents, employees, students, business owners, visitors, City staff, and the BPTC helped <br />identify challenges, opportunities, and priorities for improving walking, bicycling, and rolling in Pleasanton. Engagement activities <br />were designed to reach a broad cross-section of the community and provide multiple opportunities for participation. <br />Community input informed the Plan vision, helped identify network needs, and refined recommended improvements and project <br />implementation. The planning process consisted of three phases: <br />Phase <br />1 <br />LISTENING AND LEARNING <br />This phase focused on understanding <br />existing conditions, identifying barriers <br />and opportunities for walking and bicy- <br />cling, and establishing the Plan vision <br />and goals <br />Phase <br />2 <br />DEVELOPING <br />RECOMMENDATIONS <br />The Focus Network, draft recommen- <br />dations, and implementation strategies <br />were developed in this phase. These <br />were shared with the community and <br />the BPTC for feedback. <br />Phase <br />3 <br />FINALIZING THE PLAN <br />The final phase incorporated commu- <br />nity and BPTC feedback to refine the <br />draft recommendations and prepare <br />the draft Plan for City Council consid - <br />eration and adoption.
The URL can be used to link to this page
Your browser does not support the video tag.