My WebLink
|
Help
|
About
|
Sign Out
_Agenda_Packet_092826
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
BICYCLE PEDESTRIAN AND TRAILS
>
AGENDA PACKETS
>
2026
>
092826
>
_Agenda_Packet_092826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2026 3:28:31 PM
Creation date
9/24/2026 3:25:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/28/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ranking1 ID Street Intersection LTS Recommendation Cost <br />Ped High <br />Injury <br />Corridor <br />Access/ <br />Across <br />Barriers <br />Comfort SRTS Equity Cost Tier <br />Total <br />Points <br />Community <br />Votes Implementation2 <br />1 56 Kottinger Dr at Bernal Ave 3 Decrease crossing distance on Bernal Ave.$250,000 10 6 8 10 8 3 45 11 Long Term <br />2 50 Bernal Ave at Sunol Blvd 4 Decrease crossing distance.$250,000 10 6 6 10 8 3 43 12 Long Term <br />3 40 Santa Rita Rd at Black Ave 3 <br />Implement signal adjustments to limit turning <br />movements during pedestrian phase; <br />decrease crossing distance. <br />$250,000 10 6 8 10 0 3 38 12 Long Term <br />4 48 Bernal Ave at Pleasanton Ave 3 <br />Implement signal adjustments to limit turning <br />movements during pedestrian phase. This <br />would also improve access to trail parallel to <br />Bernal Ave. <br />$10,000 10 6 8 10 0 6 40 7 Near Term <br />5 53 Main St at Division St 2 Add traffic control to Main St crossing.$100,000 10 4 4 10 8 4 40 6 Near Term <br />6 36 Greenwood Rd at Valley Ave 3 <br />Decrease crossing distance. Implement <br />signal adjustments to limit turning movements <br />during pedestrian phase. <br />$250,000 10 4 8 10 4 3 39 7 Long Term <br />6 54 Main St at Spring St 2 Add traffic control to Main St crossing.$100,000 10 4 4 10 8 4 40 5 Near Term <br />8 38 Santa Rita Rd at Valley Ave 4 Decrease crossing distance.$250,000 10 6 6 5 4 3 34 17 Long Term <br />9 49 Bernal Ave at Old Bernal Ave 3 Implement signal adjustments to limit turning <br />movements during pedestrian phase.$10,000 0 6 8 10 8 6 38 7 Near Term <br />10 23 W Las Positas Blvd at Hopyard Rd 4 Decrease crossing distance.$250,000 10 6 6 10 0 3 35 12 Long Term <br />11 39 Santa Rita Rd at Francisco St 3 Decrease crossing distance.$250,000 10 6 8 10 0 3 37 6 Long Term <br />11 42 Main St at Stanley Blvd 3 Implement signal adjustments to limit turning <br />movements during pedestrian phase.$500,000 10 6 8 10 0 2 36 8 Long Term <br />13 41 Santa Rita Rd at Amador Valley HS crosswalk 3 Decrease crossing distance.$250,000 10 6 8 10 0 3 37 4 Long Term <br />14 43 Main St at Del Valle Pkwy 3 Implement signal adjustments to limit turning <br />movements during pedestrian phase.$500,000 10 4 8 10 0 2 34 9 Long Term <br />15 47 Bernal Ave at Valley Ave 3 Implement signal adjustments to limit turning <br />movements during pedestrian phase.$10,000 10 4 8 0 0 6 28 17 Near Term <br />16 35 Valley Ave at Crestline Dr 4 Decrease crossing distance.$250,000 10 4 6 10 0 3 33 6 Long Term <br />17 55 Kottinger Dr at First St 3 Implement signal adjustments to limit turning <br />movements during the crossing phase.$500,000 0 6 8 5 8 2 29 14 Long Term <br />18 37 Santa Rita Rd at Mohr Ave 4 Decrease crossing distance.$250,000 10 4 6 5 4 3 32 6 Long Term <br />19 52 Main St at Abbie St 1 Install RRFB or stop control if warrants are <br />met.$100,000 0 4 4 10 8 4 30 9 Near Term <br />20 51 Main St at Old Bernal Ave 1 Install RRFB or stop control if warrants are <br />met.$100,000 0 4 4 10 8 4 30 5 Near Term <br />21 1 Stoneridge Dr at Foothill Rd 4 Decrease crossing distance.$250,000 10 4 6 0 8 3 31 2 Long Term <br />22 32 Santa Rita Rd at Stoneridge Dr 4 Decrease crossing distance.$250,000 0 6 6 5 4 3 24 14 Long Term <br />Pedestrian Project Scoring
The URL can be used to link to this page
Your browser does not support the video tag.