My WebLink
|
Help
|
About
|
Sign Out
_Agenda_Packet_092826
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
BICYCLE PEDESTRIAN AND TRAILS
>
AGENDA PACKETS
>
2026
>
092826
>
_Agenda_Packet_092826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2026 3:28:31 PM
Creation date
9/24/2026 3:25:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/28/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ranking1 ID Street Intersection LTS Recommendation Cost <br />Ped High <br />Injury <br />Corridor <br />Access/ <br />Across <br />Barriers <br />Comfort SRTS Equity Cost Tier <br />Total <br />Points <br />Community <br />Votes Implementation2 <br />23 3 Foothill Rd at Muirwood Dr (north entrance) 3 Implement signal adjustments to limit turning <br />movements during pedestrian phase.$500,000 10 4 8 5 0 2 29 3 Long Term <br />24 34 Valley Ave at Blackbird Dr 4 Decrease crossing distance on Valley Ave.$250,000 10 4 6 5 0 3 28 5 Long Term <br />25 31 W Las Positas Blvd at Fairlands Dr 3 Decrease crossing distance.$250,000 0 6 8 10 0 3 27 4 Long Term <br />26 24 W Las Positas Blvd at Hacienda Dr 4 Decrease crossing distance.$250,000 0 6 6 10 0 3 25 7 Long Term <br />27 19 Stoneridge Dr at Hacienda Dr 4 Decrease crossing distance.$250,000 10 4 6 5 0 3 28 0 Long Term <br />28 30 Santa Rita Rd and W Las Positas Blvd 4 Decrease crossing distance.$250,000 0 6 6 10 0 3 25 4 Long Term <br />29 33 Santa Rita Rd at Iron Horse Trail 4 Install bridge overpass to connect trail across <br />Santa Rita Rd.3 $500,000 0 6 6 5 4 2 22 10 Long Term <br />29 44 Foothill Rd at Bernal Ave 3 Implement signal adjustments to limit turning <br />movements during pedestrian phase.$10,000 0 4 8 0 4 6 22 10 Near Term <br />31 22 W Las Positas Blvd at Dorman Rd 4 Decrease crossing distance.$250,000 0 6 6 10 0 3 25 3 Long Term <br />32 45 Bernal Ave at I-680 NB off-ramp 3 Implement signal adjustments to limit turning <br />movements during pedestrian phase.$10,000 0 4 8 0 0 6 18 17 Near Term <br />33 2 Foothill Rd at Moller Ranch Dr 4 Implement traffic control. Install marked <br />crosswalks.$100,000 10 4 6 0 0 4 24 2 Near Term <br />34 7 Stoneridge Dr at Stoneridge Mall Dr 3 <br />Implement signal adjustments to limit turning <br />movements during pedestrian phase; <br />decrease crossing distance. <br />$250,000 0 4 8 0 8 3 23 2 Long Term <br />34 11 Owens Dr at Willow Rd 4 Decrease crossing distance.$250,000 10 4 6 0 0 3 23 2 Long Term <br />34 28 Santa Rita Rd at Rosewood Dr 4 Decrease crossing distance.$250,000 0 4 6 10 0 3 23 2 Long Term <br />37 4 Stoneridge Dr at Springdale Ave 3 <br />Implement signal adjustments to limit turning <br />movements during pedestrian phase; <br />decrease crossing distance. <br />$500,000 0 4 8 0 8 2 22 3 Long Term <br />38 21 Willow Rd at Inglewood Dr 4 <br />Install marked crosswalk on Willow Rd plus <br />traffic control and/or decrease crossing <br />distance. <br />$250,000 0 4 6 10 0 3 23 1 Long Term <br />38 29 Santa Rita Rd at Old Santa Rita Rd 4 Decrease crossing distance.$250,000 0 4 6 10 0 3 23 1 Long Term <br />40 9 Hopyard Rd at Owens Dr 4 Decrease crossing distance.$250,000 10 4 6 0 0 3 23 0 Long Term <br />40 10 Owens Dr at Chabot Dr 4 Decrease crossing distance.$250,000 10 4 6 0 0 3 23 0 Long Term <br />42 57 Valley Ave at Busch Rd 3 <br />Install marked crosswalks on both Valley Ave <br />approaches, decrease crossing distance (all <br />approaches), and implement signal <br />adjustments to limit turning movements <br />during the crossing phase.4 <br />$250,000 0 4 8 5 0 3 20 - Long Term <br />43 18 Stoneridge Dr at Gibraltar Dr 3 <br />Implement signal adjustments to limit turning <br />movements during pedestrian phase; <br />decrease crossing distance. <br />$500,000 0 6 8 5 0 2 21 1 Long Term <br />44 46 Bernal Ave at Koll Center Dr 3 <br />Decrease crossing distance. Implement <br />signal adjustments to limit turning movements <br />during pedestrian phase. <br />$250,000 0 4 8 0 0 3 18 6 Long Term <br />45 58 Valley Ave at Stanley Blvd 3 <br />Implement signal adjustments to limit turning <br />movements during the pedestrian phase. <br />Decrease crossing distance.4 <br />$250,000 0 8 8 0 0 3 19 - Long Term <br />46 5 Stoneridge Mall Rd at Workday Wy 3 Implement signal adjustments to limit turning <br />movements during the crossing phase; $250,000 0 0 8 0 8 3 20 1 Long Term <br />47 17 Willow Rd at Stoneridge Dr 3 <br />Implement signal adjustments to limit turning <br />movements during the crossing phase; <br />decrease crossing distance. <br />$500,000 0 4 8 5 0 2 19 1 Long Term <br />47 27 Santa Rita Rd at Pimlico Dr 4 Decrease crossing distance.$250,000 0 4 6 5 0 3 18 3 Long Term
The URL can be used to link to this page
Your browser does not support the video tag.