My WebLink
|
Help
|
About
|
Sign Out
PONDERSOA HOMES - FIRST CARBON
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
P
>
PONDERSOA HOMES - FIRST CARBON
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2026 3:12:14 PM
Creation date
10/7/2026 3:09:28 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
4/26/2023
LONG TERM AGREEMENTS - NAME
PONDEROSA HOMES
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: BE74E31B-F73A-4A43-� 98D4E6CBC6F5 <br />Effects Found not to be Significant <br />CEQA Guidelines Section 15143 establishes that EIRs shall focus on significant impacts on the <br />environment and need not discuss in detail effects that are clearly insignificant or unlikely to occur (e.g., <br />aviation safety risks). Topics that will be addressed include agriculture and forestry resources; geology, <br />soils, and seismicity; mineral resources; population and housing, and recreation. <br />Other CEQA Required Sections <br />This section will address the CEQA-required issues of significant environmental effects that cannot be <br />avoided (CEQA Guidelines Section 15126(b)), significant irreversible environmental changes (CEQA <br />Guidelines Section 15126(c)), growth inducement (CEQA Guidelines Section 15126(d)), and energy <br />conservation (CEQA Guidelines Appendix F). <br />Persons and Organizations Consulted/List of Preparers <br />In accordance with CEQA Guidelines Section 15129, the EIR will identify all agencies, organizations, and <br />individuals consulted during the preparation of the document, as well as the agency representatives and <br />firms that were involved with EIR preparation. <br />References <br />This section will list all resources used in the preparation of the EIR <br />Technical Appendices <br />Pursuant to CEQA Guidelines Section 15147, supporting technical information will be appended to the <br />EIR as technical appendices. This includes but is not limited to technical studies, modeling data, and <br />correspondence. <br />Deliverables <br />• Ten (10) hard copies of the Administrative Draft EIR to the City <br />• One (1) electronic version of the Administrative Draft EIR to the City <br />Task 5: Screencheck Draft EIR <br />Upon receipt of final City staff comments on the Administrative Draft EIR, FCS will prepare a Screencheck <br />Draft EIR that shows edits in track changes. <br />Deliverable <br />• One (1) electronic version of the Screencheck Draft EIR to the City <br />Task 6: Draft EIR <br />Upon receipt of final City staff comments on the Screencheck Draft EIR, FCS will proceed with finalizing and <br />producing the Draft EIR for public review. This task assumes technical staff time to complete revisions to <br />the Draft EIR, plus editing and administrative staff time to prepare the document for publication. If <br />additional hours are required, we will prepare a budget augment to cover the actual level of effort. <br />NORTH AMERICA I EUROK 1 AFRICA I AUSI RADA 1 ASIA <br />FIRSTCARBONSOLUTIONS.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.