My WebLink
|
Help
|
About
|
Sign Out
PONDERSOA HOMES - FIRST CARBON
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
P
>
PONDERSOA HOMES - FIRST CARBON
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2026 3:12:14 PM
Creation date
10/7/2026 3:09:28 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
4/26/2023
LONG TERM AGREEMENTS - NAME
PONDEROSA HOMES
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelbpe ID: BE74E31B-F73A-4A43-A 8D4E6CBC6F5 <br />FCS will provide copies of the Draft EIR to the City and prepare for and attend a public meeting to receive <br />comments on the Draft EIR. FCS will provide copies of the Draft EIR to the State Clearinghouse, which will <br />distribute the document to state agencies. FCS will also prepare the NOC that will be provided to the <br />State Clearinghouse as part of this task. Finally, this scope of work assumes that City staff will prepare <br />and mail the Draft EIR Notice of Availability to local agencies and interested parties. <br />Deliverables <br />• Fifty (50) hard copies (appendices on CD) and one (1) electronic version of the Draft EIR (including <br />appendices) to the City for circulation <br />• Fifteen (15) Executive Summary hard copies and fifteen (15) CDs of the Draft EIR and the signed <br />NOC form to the State Clearinghouse <br />Task 7: Administrative Final EIR <br />FCS will prepare an Administrative Final EIR in accordance with the applicable requirements contained in <br />CEQA Guidelines Sections 15088 and 15089. The Administrative Final EIR will list all agencies, <br />organizations, and individuals who submitted written comments on the Draft EIR during the public <br />review period and provide written responses to those comments. To enhance readability and avoid <br />redundancy, FCS will use Master Responses to address frequent and reoccurring comments on the Draft <br />EIR's analysis. Additionally, the Administrative Final EIR will contain an Errata, which will document minor <br />changes to the Draft EIR text in strikeout -underline format. <br />We have budgeted 80 hours of FCS staff time (including technical, editing, and administrative personnel) <br />for this task. Together with the City, FCS will evaluate the volume and complexity of comments received <br />on the Draft EIR. If additional time is required beyond what is budgeted, FCS will prepare a budget <br />augment to cover the actual level of effort. <br />Deliverables <br />• Ten (10) hard copies of the Administrative Final EIR to the City <br />• One (1) electronic version of the Administrative Final EIR to the City <br />Task 8: Screencheck Final EIR <br />Once City staff provides comments on the Administrative Final EIR, FCS will prepare a Screencheck Final <br />EIR that shows edits in track changes. <br />Deliverable <br />• One (1) electronic version of the Screencheck Final EIR to the City <br />Task 9: Final EIR <br />Once City staff provides final comments on the Screencheck Final EIR, FCS will proceed with finalizing <br />and producing the Final EIR for public review. This task assumes technical staff time will be required to <br />complete revisions to the Final EIR, plus editing and administrative staff time to prepare the document <br />MOM AWRtCA I ruNncY 1 ArpM I AUSTeAi LA1 ASIA <br />FIRSTCAR90NSOLUTIONS.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.