Laserfiche WebLink
DocuSign Envelope ID: BE74E31B-F73A-4A43-A 38D4E6CBC6F5 <br />for publication. If additional hours are required, we will prepare a budget augment to cover the actual <br />level of effort. FCS will provide copies of the Final EIR to the City, which will be responsible for local <br />distribution, noticing, and posting. FCS will send copies of the Final EIR directly to state agencies that <br />commented on the Draft EIR. Finally, this scope of work assumes that City staff will prepare and mail all <br />notices associated with the Final EIR to local agencies and interested parties. <br />Deliverables <br />Fifty (50) hard copies (appendices on CD) and one (1) electronic version of the Final EIR (including <br />appendices) to the City <br />One (1) CD of the Final EIR to each public agency that commented on the Draft EIR (FCS will be <br />responsible for this task) <br />Mitigation Monitoring and Reporting Program <br />FCS will prepare a comprehensive Mitigation Monitoring and Reporting Program (MMRP), pursuant to <br />CECIA Guidelines Section 15097. The MMRP will contain all mitigation measures identified in the EIR. <br />This comprehensive MMRP will provide City staff with a single source of reference to the full range of <br />mitigation measures to be implemented. For each measure or group of similar measures, the agency <br />responsible for ensuring proper implementation will be identified, along with the timing and method of <br />verification. Copies of the MMRP will be included in the Final EIR submittal. <br />Deliverable <br />• One (1) electronic version (PDF format) of the MMRP to City <br />Notice of Determination <br />FCS will prepare the Notice of Determination (NOD) and provide it to City staff or applicant for filing with <br />the Alameda County Clerk's Office within five business days of EIR certification. As indicated in this scope of <br />work, City staff or the applicant will be responsible for filing the NOD and paying the associated filing fees. <br />Deliverable <br />• One (1) electronic version (PDF format) of the NOD to the City <br />Task 10: Findings of Fact/Statement of Overriding Considerations <br />FCS will prepare the Findings of Fact/Statement of Overriding Consideration pursuant to CEQA <br />Guidelines Sections 15091 and 15093. The Findings of Fact will provide a brief rationale for each <br />significant effect that can be mitigated to a less -than -significant level. If the EIR identifies one or more <br />significant unavoidable impact, a Statement of Overriding Considerations will be prepared that outlines <br />the economic, legal, social, technological, or other benefits of the project that outweigh its <br />environmental consequences. <br />NOUN AMERICA I EUROPE I AFRICA I AUSMAL14 I A514 <br />FIRSTCARBONSOLUTIONS.COM <br />