Laserfiche WebLink
72. The operato: shall comply with Regulation g, l~ule 34 o~ the ~AAQ~D, ~egar~ng <br /> ~ntrol of ~ ~Ox e~ssions from g~-~wered t~bines. ~e operator sh~l revise ~e <br /> L~dfill G~ M~agement PI~ for Fill Area I to m~e it apply to ~e AL~ Cl~s II <br /> Exp~sion ma. ~e PI~ shall include a system ~ w~ch m det~t ~d consol <br /> ~tenti~ly olmile g~es generm~ by ~e proposed project. ~e PI~ sh~l se~e to <br /> prevent lin{ ~I1 g~ h~rds t~0ugh g~ collation ~d mnvemion to ener~; det~ti0n 0f <br /> g~ mi~fio a ~d emissions; ~d documentation of the effectiveness of~e system. <br /> <br />73. ~e op~tqr s~ll use all re~onably collectable ~d deliverable l~dfill g~ for ~e <br /> pr~uction ~f elecfficiW in an elecffiml generating f~ility w~ch h~ a designed capaciW <br /> to h~dle ~e w~ estimat~ g~ production of ~e dispos~ site and utilizes high <br /> efficiency ~nve~ion equipment such ~ g~ turb~es. <br /> <br />74. The operato shall ensure optimal operations Of the gas collection system with regular <br /> maintenanc~ and service, and with periodic monitoring as determined by the BAAQMD. <br /> The Landfil Gas Collection System for the landfill expansion shall be constructed and <br /> operated pu 'suant to BAAQMD permits. The operator shall implement Best Available <br /> Control Tee mologies for Toxics (T-BACT) on applicable emission sources as required <br /> by the BAAOMD. <br /> <br />75. Hazards as~ ~ciated with gas accumulation in on-site buildings prevented by <br /> shall <br /> be <br /> regular mort toting of building air; proper ventilation, both within the buildings and under <br /> the slabs; ubgrade membranes; gas collection devices; and, spark-proof electrical <br /> systems, as' determined by the BAAQMD and LEA. The landfill operator shall not <br /> construct or otherwise locate any structure for occupancy in an area of known landfill gas <br /> buildup. ~f he operator shall verify the absence of landfill gas buildup prior to any <br /> constructior activity in all are~ known to have the potential for gas accumulation (and <br /> areas withil 1,000 feet of the landfill footprint) and incorporate gas monitoring and <br /> control mca)utes in the design of any structures that would be constructed in such areas. <br /> 76. All site pen ~nnel working in structures shall be trained in the purpose of the landfill gas <br /> monitoring: ystem and the proper response to an alarm. <br /> <br /> 77. Consistent ~4th Section 17783(d) of the CCR Title 14, landfill gas monitoring and <br /> control systems at the ALRRF shall be modified during the postelosure maintenance <br /> period to re,fleet changing land uses adjacent to the site. <br /> <br /> 78. The operator shall control odors per CCR Title 14, Division 7, Chapter 3, Article 7.6, <br /> Table III.I-1 in Section III.I., Public Health and Safety, for <br /> 17701 <br /> and ]17713(refer <br /> to <br /> details). Tl{e operator shall continue to conduct a monitoring program as required by <br /> BAAQMD permit to ensure that there are no major odor leaks to the atmosphere. <br /> 79. The operator shall bury excessively odorous wastes immediately with other landfill <br /> wastes, dep mding on their nature and source. The operator shall ensure that loading, <br /> md material activities carried out efficiently and without delays <br /> unloading, <br /> handling <br /> axe <br /> to avoid ex¢essive odors. <br /> <br /> NOISE <br /> <br /> 23-B <br /> Final Altamont Settlement - Exhibit B <br /> <br /> <br />