Laserfiche WebLink
80. All internal c ~mbustion engines on equipment used at the project site and for roadway <br /> construction :~hall be equipped with mufflers equal to or better than that supplied by the <br /> vehicle man~ facturer. All equipment shall be maintained in good mechanical condition <br /> so as to min mize noise from faulty engines, drive trains, and other components. No <br /> muffler or ¢:'~aust system shall b~ equipped with cutout, bypass, or similar devices <br /> intended to ti wart quieting. <br /> <br />81. The operato~ shall provide the option of retrofitting existing noise-sensitive land uses <br /> along Altambnt Pass Road to reduce exterior noise levels to 45 dBA, Ldn. "Exterior <br /> noise levels" ]means exterior noise as heard inside residences. This option shall apply at a <br /> minimum to fhe two residences southwest of the landfill. The option might also apply to <br /> the residene~ on Altamont Pass Road east of the landfill, or other noise-sensitive uses <br /> along the r~ad, if any (the potential impact would need to be calculated at those <br /> locations). ~Exterior noise levels could be reduced by double-panning windows and <br /> adding sound insulafion on walls facing the roads. The homes shall be retrofitted prior to <br /> the commencement of filling operations in the Class II Landfill Expansion Area. <br /> <br />82. When condu, ;ting design review for future noise-sensitive land uses along Altamont Pass <br /> Road (as is r~ :quired for proposed development in Agricultural zoning districts), Alameda <br /> County Plan aing Department staff shall consider the potential noise exposure from <br /> landfill acti~ ities, and require site and/or building design features to keep noise at <br /> acceptable le ~els. <br /> <br />83. Before June! 30, 2000, the operator shall submit for Planning Department review a <br /> detailed draft Mitigation Monitoring and Reporting Program (MMRP) for monitoring and <br /> enforcement Iof the impact mitigation measures and conditions of approval for the project <br /> as directed tn the Mitigation Monitoring Program adopted for this Conditional Use <br /> Permit. Pri(~r to implementation of any mitigation measures, a final program shall be <br /> submitted four review and adoption by the Planning Department on or before September <br /> 30, 2000. l <br /> An annual p~ogress report shall be submitted to the Planning Director and LEA for <br /> concurrent r4view at the beginning of each calendar year. The operator shall respond to <br /> and report oxt the stares of each condition of this permit. <br /> <br /> The MMRP ;hall require that the operator pay to Alameda County full costs incurred for <br /> review, appr~ ~val, administration, monitoring and inspection of all programs. This <br /> amount does not include routine costs of the LEA program or programs mandated by <br /> other respom ible agencies. A minimum amount of $10,000 shall be deposited and <br /> maintained a: that level, in trust, to the Treasurer, Alameda County, for MMRP review <br /> and related n tonitoring costs. <br /> <br /> 24-B <br /> Final Altamont Settlement - Exhibit B <br /> <br /> <br />