My WebLink
|
Help
|
About
|
Sign Out
SR 05:062
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:062
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2005 10:37:42 AM
Creation date
2/24/2005 9:37:35 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/1/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Plannin~ Department may use its employees, employees of the Planning Department, <br /> other agencies or private consultants, as needed, to conduct such reviews, inspections and <br /> administration to ensure satisfactory implementation and enforcement of these measures <br /> and may include hiring additional personnel on a part-time or full-time basis. When <br /> required by,he Planning Department, the operator shall post an additional cash deposit, <br /> as determined to be necessary, to cover estimated costs to satisfy this requirement. <br /> <br />84. A Notice o~Acceptance of the ALRRF Closure Plan and Postclosure Maintenance Plan <br /> approved by the California Integrated Waste Management Board and LEA shall be <br /> submitted t~the Planning Department for review prior to initiation of facility closure. <br /> <br />85. A copy of ~e evidence of f~mancial ability, approved by the California Integrated Waste <br /> Managemenk Board and LEA, to provide for the cost of closure and postclosure <br /> maintenance, in an amount equal to the estimated cost of closure and 30 years of <br /> postelosure ~naintenance, contained in the closure plan and the postclosure maintenance <br /> plan, shall b~ submitted to the Planning Department. <br /> <br />86. The operatoi shall hold harmless and indemnify the County of Alameda against liability <br /> for personallinjury or property damage caused by or resulting from acts or omissions by <br /> the operatorl its agents, officers or employees in conducting this landfill operation. The <br /> operator stffdl agree to defend, at their sole expense, any <br /> action <br /> brought <br /> against <br /> the <br /> County, its ~agents, officers or employees, because of the issuance or operation of this <br /> permit. Th~ operator shall reimburse the County, its agents, officers or employees for <br /> any court c&sts and attorney's fees which the County, agents, or <br /> its <br /> officers <br /> employees, <br /> may be reqtiired by a court to pay as a result of such action. The County may, at its sole <br /> discretion ~¢td expense, participate in the defense of any such action, but such <br /> participation shall not relieve the operator of the obligations <br /> under <br /> this <br /> condition. <br /> <br /> The CountyI will cooperate, to the maximum extent practicable, with the operator in the <br /> defense of ~ny such action and may, at its sole expense, <br /> discretion <br /> and <br /> participate <br /> in <br /> the <br /> defense, bud such participation will not relieve the operator of their obligations under this <br /> condition. [The operator may request revocation of this permit to minimize the <br /> obligations ~nder this condition and the County shall respond as expeditiously as possible <br /> and, to the maximum extent practicable. <br /> <br />87. If problem~ develop regarding landfill operation or restoration, as the LEA may <br /> determine bhsed on results of inspections or complaints, the operator shall take corrective <br /> action with/all due haste, in good faith, consistent with solutions approved by the LEA, <br /> who shall with affected and agencies, including the LEA, in determining <br /> c~nsult <br /> persons <br /> appropriate ?lutions. <br /> <br /> 88. If any prol~lems develop regarding slope <br /> stability, <br /> erosion <br /> control, <br /> surface <br /> water <br /> or <br /> related maters, as may be determined by the Director of Public Works, the operator shall <br /> engage an ~ngineering geologist to prepare an investigation detailing the problem and <br /> possible sdlutions in a timely manner, operator <br /> The <br /> shall <br /> implement <br /> solutions <br /> 153 <br /> <br /> approved b the Director of Public Works. <br /> <br /> 25-B <br /> Final Altamont Settlement - Exhibit B <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.