My WebLink
|
Help
|
About
|
Sign Out
SR 05:062
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:062
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2005 10:37:42 AM
Creation date
2/24/2005 9:37:35 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/1/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
89. There shall '~e no assignment, trade, sale, or any other creation of an interest by gan <br /> Francisco so lid waste exporters in their capacity at the Altamont Lanclfill to any other <br /> public agenc or private party. <br /> <br />90. Prohibition (' a Rail Haul. The operation of the ALRRF shall not include any delivery of <br /> waste to the ~LRRF by railroad. <br /> <br />91. Prohibition qn Soil Mining. The operator shall not engage in the mining of soil on the <br /> ALRRF for 4ale or export outside the ALRRF site (including any such mining for sale or <br /> export that r~quires a surface mining permit). <br /> <br /> P~rmit Reviews. Consistent with applicable provisions of the <br />92. <br /> Five <br /> Year <br /> Compliance <br /> Alameda Co aty Code, the County shall conduct a permit compliance review every five <br /> years to dete mine the compliance of the ALRRF with the provisions of this permit. The <br /> permit comg lance reviews not or <br /> shall <br /> include <br /> reconsideration <br /> terms <br /> and conditio s of this permit. <br /> <br /> I Notie~ and The County shall provide ninety advance written <br /> 92. <br /> Hearing. <br /> (90),,day <br /> notice to each of the Parties of any public hearings (the Compliance Review <br /> Henri ags') held by the County in conjunction with the County's Compliance <br /> Permit "Five Year Compliance Review"). The Planning <br /> the <br /> New <br /> (the <br /> Corm aission shall hear the Compliance Review Hearings. At least one Review <br /> Henri ag for each Five Year Compliance Review shall take place in the evening in <br /> Live~more. The County shall publish notices of all Compliance Review Hearings <br /> at lea~t 60 days prior to the earliest such hearing in major newspapers of general <br /> circulation in the County, including the Tfi-Valley Herald, the Independent and <br /> the Halley Times. The operator's submittals County staff reports <br /> and <br /> the <br /> relevant <br /> that re intended to be considered at any Compliance Review Hearing shall be <br /> made available to the general public, and copies shall be provided to the eitias of <br /> Liver more and Pleasanton, and representatives of the Sierra Club, the Northern <br /> Califi~rnia Recycling Association and Altamont Landowners Against Rural <br /> Misn anagement, or their designated representatives, at least forty-five (45) days <br /> prior to the public hearing. Any follow-up documentation, such as a response to <br /> or eh rification ora public comment, shall be made available to the general public <br /> uponl submittal to the County, or if prepared by the County, upon submittal to the <br /> plamfing Commission. The County shall make copies of all such written <br /> materials publicly available at one or more locations in Livermore and in the City <br /> of O ~kland.~ <br /> <br /> 92.2 Operator Submissions. In connection with each Five Year Compliance Review, <br /> the c ~erator shall submit to the County (i) comprehensive information on the <br /> mc, or of ALRRF's compliance with the terms and conditions of this permit, (ii) <br /> curre at data and information included in the required reports made pursuant to the <br /> Calif mia Integrated Waste Management Act, Public Resources Code Sections <br /> 4005 et. seq., in connection with review of the Solid Waste Facilities Permit for <br /> ALR ~, (iii) current data and information included in the required reports made <br /> to th, RWQCB in connection with review of waste discharge requirements, (iv) <br /> <br /> 26-B Final Aitamont Settlement Exhibit I~ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.