Laserfiche WebLink
<br />In response to the adjoining Birch Creek Townhouse resident's concerns, staff requests that the <br />landscaping design at the northeast corner of the site near the "Y" turn-around area consider <br />planting materials that would effectively block vehicle head lights from shining onto adjoining <br />buildings. Staff has included a condition of approval addressing this issue. <br /> <br />Traffic <br /> <br />Based on the Institute of Transportation Engineers standard, the trip generation rate for a <br />condominium project has a 0.66 AM rate and a 0.83 PM rate. The City Traffic Engineer does <br />not believe that the proposed project would overburden the existing traffic pattern in the area. <br /> <br />However, the residents who attended the neighborhood meeting raised the concerns that the <br />existing Vineyard Avenue AM peak hours are impacted by traffic volumes and by speed. They <br />stated that the Valley View Elementary School, which is within walking distance from the <br />project site, results in traffic and safety problems for the neighborhood. They believed that the <br />proposed 45 residential units would further impact the already unacceptable traffic pattern on <br />Vineyard Avenue. <br /> <br />Dowling Associates, City traffic consulting firm, has created a traffic model for the proposed <br />project, which collected the data for the AM and PM trip distribution for both the existing <br />AM/PM trips and the forecasted trips generated by the project. In review of the collected data, <br />the City Traffic Engineer concluded the that the intersections that would be included in a traffic <br />study have already been studied when the Bernal Commercial Project, located on Bernal Avenue <br />between Stanley Boulevard and Nevada Street, was pending review in August 2005. Therefore, <br />it is unnecessary to perform a separate traffic study to investigate traffic impact at the same <br />intersections. Additionally, the Bernal Commercial Project has a higher traffic impact on the <br />intersections than the proposed 45-unit residential condominium project. The Bernal <br />Commercial Project was not required to mitigate the existing traffic other than paying the <br />required traffic fees. The City Traffic Engineer recommends that the applicant pay for the <br />required traffic fee. A condition of approval has addressed this issue. <br /> <br />Parking <br /> <br />During the neighborhood meeting that was held by staff, the neighbors residing on the nearby <br />single-family zoned streets, such as Adams Way and Amador Court, specifically expressed <br />concerns that the curbside parking in the front oftheir homes would be impacted. They <br />indicated that these spaces are being occupied by the tenants from the existing apartment <br />complex due to lack of adequate on-site parking provided by that development. They requested <br />the applicant consider the parking impacts that would be generated when the residents have <br />more vehicles than what could be accommodated inside the two-car garages. They urged that <br />sufficient parking be provided on site; including parking for guests and parking for residents <br /> <br />Case No. PUD.49 Planning Commission <br />Page - 7 - <br />