My WebLink
|
Help
|
About
|
Sign Out
RES 95024X
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1995
>
RES 95024X
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2012 11:10:33 AM
Creation date
2/25/1999 5:48:59 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/21/1995
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Action Plan -- <br /> <br /> Tri-Va!ley Action Plan <br /> Highways (Continued) <br /> <br /> Key Locations <br /> <br /> Facility: 1-580 West of Foothill at Tassajara at Altamont <br /> <br /> Existing Configuration 8 lanes 8 lanes 8 lanes <br /> Existing Volume~ 7,000 8,000 5,100 <br /> Existing V/C 0.80 0.91 0.58 <br /> <br /> 2010 Expected Network -- <br /> Planned changes: SB to EB flyover at 1-680/I-580 interchange, improve interchanges to parclo design at Foolhill/San Ramon, <br /> Fallon/El Charro, Vasco Road, Greenville Road, North Livermore Avenue, and First Street, remove interchange at Portola; <br /> addition of new interchange at Isabel extension (part of the Route 84 project). <br /> <br /> 2010 Configuration 8 lanes 8 lanes 8 lanes <br /> Volume 8,800 (constrained) 8,800 (constrained) 8,800 <br /> (constrained) ' <br /> Transit Service (busedhour both di- 18 + BART 20 None <br /> rections) <br /> Transit Ridership (peak hour) 3,914 168 0 __ <br /> V/C constrajned [before Action Plan] 1.00 (1.07) 1.00 (1.23) 1.00 (1.40) <br /> (unconstrained) <br /> (1-1/2 hours of congestion) (4 hours of congestion) (5 hours of con- <br /> gestion) -- <br /> <br /> Traffic Pattern Dublin 23% Danville 0% Livermore 25% <br /> Pleasanton 24% San Ramon 6% Pleasanton 14°/, <br /> Livermore 24% Livermore 39% Danvilla 1% <br /> CCC 5% Dublin 15% San Ramon 8% <br /> Danville 1% Pleasanton 15% CCC 3% <br /> San Ramon 5% CCC 3% Dublin 9% -- <br /> Through 16% Through 28% Through 40% <br /> <br /> TSO to be achieved Los F no more than 2 LOS F no more than 2 None--not within TVTC control ' <br /> hours hours <br /> <br /> Recommended Actions None. 1. Pursue HOV lanes 1. Support major transit invest- _ <br /> Tassajara to N. Livermore. ment in corridor. <br /> 2. Pursue removal of the 2. Oppose increases in mixed- <br /> restriction on HOV lanes. flow capacity. <br /> 3. Advocate HOV lanes. N. -- <br /> Livermore to county line. <br /> 4. Pursue removal of the re- <br /> sriction on HOV lanes. <br /> <br /> Note: A deficiency plan will be required if the level of service becomes LOS F on any segment. <br /> <br />Barton-Aschman Associates, Inc. 170 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.