Laserfiche WebLink
Action Plan <br /> <br /> Tri-Valley Action Plan <br /> Highways (Continued) <br /> <br /> Key Locaaons <br /> <br /> Facility: Santa Rite Road at Stoneriage 1-580 EB Off-Ramo <br /> <br /> ExisUng Configuration 6 lanes 3 lanes <br /> Existing Volume' 1,300 <br /> Existjng V/C 0.24 <br /> <br />-- 2010 Expe=led Network <br /> Planned changes: Widening to 6 lanes Irom 1-580 to Old Santa Rita Road ($1.6 million), developer funding. <br /> <br /> 2010 Configuration 6 lanes 3 lanes <br /> Volume 2,700 1,231 <br /> Transit Service (buses/hour both 6 <br /> directions) <br /> Transit Ridership (peak hour) 63 100 <br /> VIC constrained {before Action Plan} 0.50 0.38 <br /> (unconsrained) <br /> <br /> Traffic Pattam Pleasanton 59% <br /> Dublin 25% <br /> Livermorn 10% <br /> Deny}lie 0% <br /> San Ramon 2% <br /> CCC 4% <br /> Through 0% <br /> <br /> TSO to be achieved V/C < 0.90 at inter- V/C < 0.90 at inter- <br /> section. saclion. <br /> <br /> Recommended Action~L None. 1. Obtain agree- <br /> menIs with Dublin <br /> and ConIra Costa <br /> County to widen EB <br /> off-ramp to provide <br /> double left rum. <br /> <br /> Further aclions shall be iden~ed by the TSO Management Study at its complelion. <br /> <br /> Barton-Aschman Associates, Inc. 206 <br /> <br /> <br />