Laserfiche WebLink
<br />program would mitigate the impacts to a less-than-significant level under <br />the approved + Project scenario. <br /> <br />The City finds improvements to the two remaining intersections are also <br />feasible, and are planned for the cumulative time period. These improve- <br />ments will result in satisfactory operations at the intersections under the <br />cumulative + Project scenario. <br /> <br />Specific Plan, pp. 58-59; DEIR, p. 144-150. <br /> <br />2. Traffic volumes generated by the Project in excess of level of service standards at <br />24 intersections under the cumulative + Project scenario <br /> <br />Finding. The City finds that mitigation measures identified for 22 ofthe 24 <br />intersections are feasible and that revisions to the City's traffic impact fee <br />program would mitigate the impacts to a less-than-significant level under <br />the cumulative + Project scenario. <br /> <br />Finding The City finds that feasible improvements to the two remaining intersections <br />would not improve all operations at those intersections to acceptable service <br />standards. Therefore, the impact on those two intersections would remain <br />significant and unavoidable. A statement of overriding considerations for <br />this impact is made in the following section. <br />Specific Plan, pp. 58-59; DEIR, p. 147-150. <br /> <br />3. Traffic volumes generated by the Project in excess of service criteria based on <br />General Plan roadway capacity policies <br /> <br />Finding. The City finds that the following mitigation measures are feasible and have <br />been incorporated into the Specific Plan, thereby mitigating the impact to a <br />less-than-significant level: <br /> <br />. Add one additional travel lane in the impacted direction to the applicable <br />roadway segments to insure that adequate capacity is available to handle <br />the projected traffic. <br /> <br />. Plan and finance the identified improvements through the update ofthe <br />traffic impact fee program <br /> <br />Specific Plan, p. 58-60; DEIR, pp. 150-151. <br /> <br />4. Potential increase in traffic hazards due to a design feature or incompatible uses <br /> <br />Finding. The City finds that the planning process proposed for the selection and design <br />of specific uses to be developed under the Project would reduce the risk of <br />creating hazardous circulation conditions to the less-than-significant level: <br /> <br />. The access to the park-and-ride lot should be located to ensure that there <br />are adequate vehicle storage lane lengths for travel lanes on West Lagoon <br />Road at Bernal Avenue. <br /> <br />Bernal Property Phase II Specific Plan and Bernal Community Park Master Plan <br />Environmental Impact Report Findings and Statement of Overriding Considerations <br /> <br />Page 19 of23 <br />