Laserfiche WebLink
<br />Draft Environmental Impact Report <br />Bernal Property Phase II Specific Plan <br /> <br />Operation Period Impacts <br /> <br />New construction and intensified land uses at the project area would result in increased <br />vehicle use and potential discharge of associated pollutants. Leaks of fuel or lubricants, tire <br />and brake pad wear, and fallout from exhaust contribute petroleum hydrocarbons, heavy <br />metals, and sediment to the pollutant load in runoff being transported to receiving waters. <br />Runoff from landscaped areas and sports fields may contain residual pesticides and nutrients. <br />Animal waste from any areas used for stock raising (e.g., from the potential agriculture club), if <br />improperly managed, could pollute runoff. Long-term degradation of the quality of runoff <br />from the site could impact the quality of receiving waters. <br /> <br />The City of Pleasanton recognizes that impacts related to water quality degradation could <br />occur as a result of the type of development proposed. Therefore, the Specific Plan specifies <br />that all projects under the plan will fully comply with Countywide National Pollutant <br />Discharge Elimination System (N PDES) permit and City ordinance. The proponent of each <br />grading component within the Plan area that disturbs more than one acre of land will be <br />required to prepare a Stormwater Prevention Plan (SWPPP) designed to reduce potential <br />impacts on surface water quality through the construction period of the project. It is not <br />required that the Swppp be submitted to the Regional Water Quality Control Board <br />(RWQCB), but it must be maintained onsite and made available to City and RWQCB staff <br />upon request. The SWPPP would provide measures to mitigate potential water quality <br />impacts associated with Plan implementation during grading and construction operations. <br /> <br />Water quality would be protected by designing the potential agriculture club to channel <br />animal waste to the City's sanitary sewer, or to otherwise manage that waste to avoid its <br />pollution of runoff. <br /> <br />As described under c.1 above, it is required that all projects in the Plan area fully comply <br />with the C.3 N PDES permit requirements. These permit provisions include requirements for <br />addressing stormwater quality during the operation phase of the project. In general, <br />passive, low-maintenance BM Ps ("best management practices," in this case, for example, <br />bioswales, porous pavements, and stormwater planters) are preferred. As stated in the <br />Specific Plan, the detention basins (and all other water quality features) would be designed <br />and sized in accordance with the County NPDES permit C.3 requirements for water quality <br />treatment by a civil engineer. Therefore, enforcement of existing regulations would be <br />adequate to mitigate potential impacts on stormwater quality. <br /> <br />No adverse environmental impacts relating to surface water quality would occur because the <br />Specific Plan contains adequate provisions to mitigate these potential impacts. <br /> <br />(3) Degradation of Groundwater Resources <br /> <br />It is possible that, under the proposed project, the existing onsite detention basins would be <br />expanded. One function of these basins is to treat stormwater in compliance with NPDES <br />requirements. Stormwater from parking lots, roadways, and sports fields may contain <br />urban-type pollutants. These pollutants could infiltrate through the bottoms of the basins <br />and eventually reach the water table, degrading groundwater quality. <br /> <br />90 <br />