Laserfiche WebLink
<br />Chapter 4 <br />Environmental Setting, Impacts, and Mitigation Measures <br />K. Open Space <br /> <br />included are a cultural arts center, a child care center, an environmental education center, <br />and a youth/community center. If all these uses were built at the scale suggested in the <br />proposed Plan, the amount of land associated with them (respectively, 9.2 acres, 1.2 acres, <br />1.7 acres, and 2.8 acres) would amount to a minor part of the developed site. Even with the <br />addition of a potential park and ride facility (1.5 acres) or the ACE train station (6.5 acres), <br />the land area devoted to structures remains a small proportion of the 318-acre total. <br /> <br />b. Significance Criteria <br /> <br />CEQA Guidelines do not establish significance criteria for open space. <br /> <br />Significance criteria for recreation are discussed in Chapter 4, Section N. Parks and <br />Recreation. Other aspects of open space are referred to tangentially elsewhere in the <br />Appendix G Guidelines: for example, biological resources criterion (I) and land use criterion <br />(c) mention a 'natural community conservation' plan. Pleasanton does not have such a plan <br />at present. <br /> <br />c. Impacts <br /> <br />In the case of the Bernal Property Phase II Specific Plan and the Community Park Master <br />Plan, the site is largely open space at the present time and would remain largely in open <br />space under the Plan. The provisions of the Plan would both commit the use to open space <br />over an extended period, and provide for the establishment, maintenance, and sustainability <br />of natural plant communities on the site, in a planned and strategic manner. <br /> <br />Give the open space emphasis of the Phase II Specific Plan as a whole, and the extensive <br />planning and implementation direction it gives for the creation and enhancement of open <br />space uses, the project would have a beneficial impact on open space. <br /> <br />No adverse open space impact would result. <br /> <br />d. Mitigation Measures <br /> <br />No significant effects on open space have been identified; therefore, no mitigation measures <br />are needed. <br /> <br />115 <br />