My WebLink
|
Help
|
About
|
Sign Out
RES 06035
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2006
>
RES 06035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2006 4:17:08 PM
Creation date
6/7/2006 4:02:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/16/2006
DOCUMENT NO
RES 06035
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Draft Environmental I mpact Report <br />Bernal Property Phase II Specific Plan <br /> <br />c. Impacts <br /> <br />(1) Traffic Volumes Generated by the Project in Excess of Level of Service Standards <br /> <br />As noted above in the description of the project setting, those intersections projected to <br />operate at unsatisfactory levels of service (LOS E or LOS F) under future conditions without <br />the project would continue to operate at the same projected unsatisfactory service levels <br />with the project. <br /> <br />As shown in the tables presented in Appendix F, Part 11, the project represents a minority of <br />the increases in traffic projected for those intersections. The impact of the Phase II Specific <br />Plan on congestion at those intersections would not be a project impact; rather, it would <br />contribute to an unsatisfactory cumulative condition that would exist even without the project. <br /> <br />Approved+Project Scenario <br /> <br />The development of the Phase 11 Bernal Property would result in some significant impacts at <br />some of the analysis intersections. Further, the development plan may require additional <br />mitigation as the plan becomes more defined. <br /> <br />There are 25 locations at which the project would contribute traffic to intersections that <br />would have unsatisfactory service levels under the APPROVED + PROJECT scenario. <br />Appendix F includes detailed tables showing the number of project trips added at each location. <br />The affected intersections, which would operate at L05 E or F under with-project conditions, are <br />as follows: <br /> <br />Bernal @ 1-680 SB <br />Bernal @ Kottinger <br />Bernal @ Main <br />Bernal @ Valley <br />First @ Kottinger /Spring <br />First @ Ray / Vineyard <br />Hopyard @ 1-580 EB Ramp <br />Hopyard @ Del Valle <br />Hopyard @ Owens <br />Hopyard @ Stoneridge <br />Hopyard @ West Las Positas <br />Main @ Ray <br />Main @ St John <br /> <br />PM <br />AM/PM <br />AM/PM <br />PM <br />AM/PM <br />AM/PM <br />PM <br />PM <br />PM <br />AM <br />PM <br />PM <br />PM <br /> <br />Main @ St Mary <br />Santa Rita @ Stoneridge <br />Santa Rita @ Valley <br />Stanley @ Valley / Bernal <br />Stoneridge @ 1-680 NB <br />Sunol @ 1-680 NB <br />Valley @ Blackbird <br />Valley @ Crestline <br />Valley @ Hansen <br />Valley @ KolI Center Pkwy (S) <br />Valley @ Santa Cruz (S) <br />West Las Positas @ Muirwood <br /> <br />AM/PM <br />AM/PM <br />PM <br />AM/PM <br />PM <br />AM/PM <br />AM/PM <br />AM/PM <br />AM/PM <br />PM <br />AM/PM <br />AM/PM <br /> <br />ImpactOla. <br /> <br />The project would contribute to unsatisfactory levels of service at 25 <br />intersections under the approved + project scenario. <br /> <br />This impact is significant (see Significance Criterion (1)). <br /> <br />140 <br />
The URL can be used to link to this page
Your browser does not support the video tag.