Laserfiche WebLink
<br />Draft Environmental Impact Report <br />Bernal Property Phase II Specific Plan <br /> <br />. All transit stops should include bus shelters or benches, trash receptacles, and other <br />street furniture as appropriate. <br /> <br />. At the potential cultural arts center, the youth/community center, and other major <br />facilities, provide direct access to the on-site bicycle and pedestrian paths. <br /> <br />. Major facilities should include bike racks, bike parking, and bike storage lockers. <br /> <br />. All bicycle and pedestrian facilities should be ADA (Americans with Disabilities Act) <br />compliant. <br /> <br />. Local groups who use the sports fields, the potential cultural arts center and the <br />youth/community center should be encouraged to support carpooling and van pool- <br />ing to events within the site. <br /> <br />. Preferential parking for carpools and van pools should be provided. <br /> <br />With incorporation of these measures, impacts relating to support of non-automobile travel <br />would be reduced to the less-than-significant level. <br /> <br />d. Mitigation Measures <br /> <br />Measures built into the Specific Plan would reduce some potential impacts to the less-than- <br />significant level. <br /> <br />However, the impacts under criteria 1 and 2 that relate to peak hour level of service condi- <br />tions and exceedances of Pleasanton LOS roadway capacity standards are significant and <br />require mitigation. Such mitigation requires both (a) physical improvements to the <br />intersections and roadway system and (b) a program for financing and prioritizing those <br />improvements. <br /> <br />(1) Traffic Volumes Generated by the Project in Excess of Level of Service Standards <br />Physical Improvements Required <br /> <br />Mitigation measures identified below would reduce most of the impacts under Impact 01 to <br />less-than-significant levels. At those locations where mitigation measures are not feasible, <br />the impacts are considered significant and unavoidable. <br /> <br />Impact 01. <br /> <br />The project would contribute to unsatisfactory levels of service at 25 <br />intersections under the approved + project scenario. <br /> <br />Measure 01 a. <br /> <br />The following intersection improvements are required to maintain LOS D <br />or better conditions under the approved + project scenario. <br /> <br />Interseaion <br />Bernal @ 1-680 SB <br /> <br />Improvement Post.mitigation Condition <br />Install new traffic signal. The 1996 General Plan LOS C (23.8)/LOS D <br />recommends a traffic signal at this intersection. (42.4) for the AM and <br />PM peak hour. LS <br /> <br />144 <br />