Laserfiche WebLink
<br />Intersection <br />Bernal @ 1-680 SB (cont'd.) <br /> <br />Bernal @ Kottinger <br /> <br />Bernal @ Main <br /> <br />Bernal @ Valley <br />First @ Kottinger/Spring <br /> <br />First @ Ray / Vineyard <br /> <br />Hopyard @ 1-580 EB Ramp <br /> <br />Hopyard @ Del Valle <br /> <br />Hopyard @ Owens <br /> <br />Hopyard @ Stoneridge <br /> <br />Hopyard @ W. Las Positas <br /> <br />Main @ Ray <br /> <br />Main @ St John <br /> <br />Main @ St Mary <br /> <br />Santa Rita @ Stoneridge <br /> <br />Chapter 4 <br />Environmental Setting, Impacts, and Mitigation Measures <br />O. Transportation and Traffic <br /> <br />Improvement Post-mitigation Condition <br />Signal plans are currently being reviewed by Cal- LS <br />trans. In addition, widen the on-ramp to accept <br />a double westbound left turn lane. About $14 <br />million has been committed for interchange variA <br />ous improvements by developers. <br /> <br />Install new traffic signal (as recommended in the <br />1996 General Plan). <br /> <br />Install new traffic signal (as recommended in the <br />1996 General Plan). <br /> <br />See discussion be/ow. <br /> <br />The General Plan exempts this intersection from <br />the LOS D standard. <br /> <br />The General Plan exempts this intersection from <br />the LOS D standard. <br /> <br />Upgrade signal to allow for a PM peak hour <br />northbound/eastbound right turn overlap phase. <br /> <br />Install new traffic signal (as recommended in the <br />General Plan). <br /> <br />Construct southbound right turn lane. Change <br />the eastbound through-left turn lane into a sec- <br />ond left turn lane and provide permissive phas- <br />ing on the east and west approaches. Recon- <br />struct the west median to provide a third east- <br />bound left turn lane. Reconstruct east median <br />to provide second westbound right turn lane. <br /> <br />A developer recently upgraded the signal and <br />striping to convert a northbound through lane <br />into a third northbound left turn lane. This con. <br />dition result has resulted in LOS D (36.3)/D <br />(51.8). No further mitigation is needed. <br /> <br />Convert a northbound through lane into a third <br />northbound left turn lane (requires widening of <br />West Las Positas or median reconstruction to <br />receive 3 inbound lanes). <br /> <br />The General Plan exempts this intersection from <br />the LOS D standard. <br /> <br />The General Plan exempts this intersection from <br />the LOS D standard. <br /> <br />The General Plan exempts this intersection from <br />the LOS D standard. <br /> <br />Construct a southbound rightturn lane. <br /> <br />LOS A (5.9)/LOS A <br />(8.7) for the AM and <br />PM peak hour. LS <br />LOS C (27.6)/A (l0.0) <br />for the AM and PM <br />peak hour. LS <br />SU <br />LS <br /> <br />LS <br /> <br />LOS D (43.4)/C (30.5) <br />forthe AM and PM <br />peak hour. LS <br />LOS D or better for the <br />AM and PM peak hour. <br />LS <br />LOS C (32.1)/D (53.1) <br />for the AM and PM <br />peak hour. <br /> <br />LS <br /> <br />LS <br /> <br />LOS C (27.7)/D (53.6). <br />LS <br /> <br />LS <br /> <br />LS <br /> <br />LS <br /> <br />LOS D (38.7)/D (50.6) <br />for the AM and PM <br />peak hour. LS <br /> <br />145 <br />