Laserfiche WebLink
<br />Chapter 4 <br />Environmental Setting, Impacts, and Mitigation Measures <br />P. Utilities and Service Systems <br /> <br />With respect to drainage, flood control, and non-point source pollution, the Specific Plan <br />commits to the provision of adequate onsite storm water detention capacity and coordina- <br />tion with Zone 7 on stormwater release patterns to meet regional flood control objectives. <br /> <br />(1) Water Supply System and Wastewater Collection <br /> <br />The Phase I infrastructure systems for potable water supply and wastewater collection are <br />complemented in the Phase II Specific Plan by graphics showing lines that (a) existed in <br />2000, (b) were constructed in conjunction with Phase I development, and (c) would be built <br />to serve Phase II (see Figures 24 and 25). <br /> <br />(2) Surface Water Management <br /> <br />As described in Chapter 4 Part H (Hydrology and Water Quality), the Phase II Specific Plan <br />would have the following characteristics with respect to surface water management: <br /> <br />. Land uses that provide extensive permeable surfaces in the form of public park land <br />and open space. <br /> <br />. Management of storm drainage through provision of onsite stormwater detention <br />facilities incorporated into the landscape. Based on a hydrologiC study49, the <br />stormwater detention facilities were sized to accommodate the full development of <br />the site (both Phase I and Phase II) so that the discharge rate from the basins would <br />not exceed the pre-development rate of discharge for the 1 OO-year storm. <br /> <br />It is the intention of the City that all development within the Plan area fully comply with <br />Provision C.3 requirements of the Countywide National Pollutant Discharge Elimina- <br />tion System (NPDES) permit including hydromodification requirements. <br /> <br />. Surface and groundwater quality would be protected by designing the potential agri- <br />culture club to channel animal waste to the City's sanitary sewer, or to otherwise <br />manage that waste to avoid its pollution of either surface or groundwater. <br /> <br />In addition, the site plan for the Phase II Specific Plan will accommodate a water quality <br />feature (a pond of about one acre in surface area) along the redesigned drainage channel <br />along the eastern edge of the property. This pond would be used for debris/sediment <br />control only, not hydromodification. <br /> <br />(3) Solid Waste <br /> <br />The Specific Plan includes land uses that will generate a certain amount of solid waste. <br />While no estimates of solid waste generation for the project have been prepared, data <br />assembled by the California Integrated Waste Management Board (CIWMB) can be used to <br />estimate potential levels of solid waste generation. Land used predominantly as lawn <br />(sports fields, turf) generates 7.6 tons of waste per acre per year.so Businesses that include <br /> <br />49 Balance Hydrologic, Inc., November, 2000. <br />50 Carr, Nancy, California Integrated Waste Management Board, e-mail communication with Mundie & Associ- <br />ates, January 12,2006. <br /> <br />157 <br />