Laserfiche WebLink
<br />Draft Environmental Impact Report <br />Bernal Property Phase II Specific Plan <br /> <br />amusement and recreation services, parking, and botanical and zoological gardens generate <br />0.9 tons per employee per year at a waste density of90 pounds per cubic yard. <br /> <br />b. Significance Criteria <br /> <br />Significance criteria for the proposed project's impacts on Utilities and Service Systems are <br />drawn from CEQA Guidelines Appendix G (Items XVI (a) through (g)). Appendix G <br />significance criteria (c), (I), and (g) are applicable to the Phase II Specific Plan. <br /> <br />Because the 1997/2000 Phase I Bernal Property EIR addressed water supply and wastewater <br />treatment and disposal capacity for the entire Bernal Property (on the assumption of a fairly <br />intensive urban development program) and the currently proposed open space uses would <br />have lower water demand and lower wastewater generation, criteria (a), (b), (d), and (e) <br />relating respectively to exceedance of wastewater treatment requirements, exceedance of <br />water treatment capacity, exceedance of the identified water supply, and exceedance of <br />wastewater treatment capacity would not apply. <br /> <br />Impacts on utilities and service systems would be significant: <br /> <br />(1) [If the project] would require the construction of new storm water drainage <br />facilities or expansion of existing facilities, the construction of which could cause <br />significant environmental effects, <br /> <br />(2) [If the project] would not be served by a landfill with sufficient permitted capacity <br />to accommodate the project's solid waste disposal needs, and <br /> <br />(3) [If the project] would not comply with federal, state, and local statutes and regula- <br />tions related to solid waste. <br /> <br />Cities are required to provide recycling at all special events or venues that host <br />over 300 people.51 <br /> <br />c. Impacts <br /> <br />(1) Impacts on Storm Drainage <br /> <br />The project's effects on stormwater runoff, including compliance with hydromodification <br />policies of the regional flood management agency, have been taken into consideration in the <br />design and provision of the two detention basins on the Phase II site (mapped in Figure 13, <br />p.57). <br /> <br />In addition, a one-acre pond may be provided in the Central Area as a water quality feature. <br /> <br />These facilities, properly operated, together with compliance with Countywide N PDES <br />Provision C.3, would assure that the project's impacts on storm drainage would be less than <br />significant. <br /> <br />51 Diaz, Jacqui, City of Pleasant on, email communication with Mundie & Associates, January 9,2006. <br /> <br />158 <br />