My WebLink
|
Help
|
About
|
Sign Out
RES 06035
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2006
>
RES 06035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2006 4:17:08 PM
Creation date
6/7/2006 4:02:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/16/2006
DOCUMENT NO
RES 06035
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />APPENDIX F <br />TRANSPORTATION BACKGROUND INFORMATION <br /> <br />This appendix includes a series of background and supporting materials for the traffic <br />analysis for the Bernal Phase II DEIR, as follows: <br /> <br />Page <br />1. City of Pleasanton Travel Demand and Synchro Models F1 <br />2. Development Scenarios Evaluated F3 <br />3. Analysis Intersections F3 <br />4. Peak Hour Level of Service Definition F5 <br />5. Project Trip Generation F6 <br />6. Existing Roadway Network F8 <br />7. Peak Hour Volumes And Intersection Turning Movements <br />for All Project Scenarios F10 <br />8. Existing Transit System F23 <br />9. Existing Pedestrian and Bicycle Facilities F23 <br />10. Existing (2003) Conditions F25 <br />11. Future Conditions under the Existing + Approved Scenario <br />and under the General Plan Scenario F25 <br />12. Availability of Background Information F40 <br /> <br />Supplementing these materials, the level of service calculation sheets and Synchro model <br />files have been provided to the City of Pleasanton and can be reviewed at the Planning <br />Department office on request. A table of contents for this background information is <br />provided at the end of this appendix. <br /> <br />1. City of Pleasanton Travel Demand and Synchro Models <br /> <br />Introduction <br /> <br />The City of Pleasanton has developed a comprehensive traffic forecasting model including a <br />post-processing procedure which utilizes the simulation software program called Synchro to <br />evaluate peak hour intersection levels of service. The City's model was used for this study. <br />Given the unique nature ofthe project, the model required refinements to insure reasonable <br />traffic patterns and resultant traffic turn movement projections at each of the analysis <br />intersections. <br /> <br />Model Assumptions <br /> <br />The model includes all of the existing development within the City and the region. In <br />addition to the existing land development, the City has approved additional development <br />that has not yet been built or occupied. Approved development will result in an increase of <br /> <br />Fl <br />
The URL can be used to link to this page
Your browser does not support the video tag.