Laserfiche WebLink
<br />the roundabout. This allows the option for bicyclists to ride up onto the sidewalk <br />area and then walk their bikes across the crosswalks. The crosswalks are protected <br />by raised islands, where applicable, so that pedestrians only have to deal with traffic <br />on one side of the road at a time. <br /> <br />Bicyclists may also choose to ride through the roundabout along with other vehicles. <br />In this case, the size of the roundabouts slows cars to cycling speeds. The round- <br />about design also follows the federal roundabout design guidelines that specifically <br />warn against striping any bike lane within a roundabout: striping a bike lane within a <br />roundabout tends to increase bicycle collisions. <br /> <br />A 5 Comment: <br />Commissioner Roberts asked how children would get across Pleasanton Avenue. <br /> <br />Response: <br />plans for an expanded, signalized intersection of Pleasanton Avenue/Bernal Avenue <br />are provided in Figure 5 of the Bernal Community Park (BCP) Master Plan. The <br />intersection modifications will include painted crosswalks and pedestrian signal <br />indicators that include a countdown of how much time is remaining to cross the <br />street. (Note that the BCP graphic is the correct representation of the proposed <br />layout of this intersection; Specific Plan Figure 5-5 and DEI R Figure 20 are not <br />accurate and are to be corrected.) <br /> <br />A 6a Comment: <br />Kevin Close observed that the hydromodification section of the DEI R indicated an <br />increased water flow into the onsite channels. <br /> <br />Response: <br />The designed storm drainage facilities throughout the Bernal property routes storm water <br />runoff two different ways. For new impervious surfaces (streets, driveways, roofs, <br />parking lots, etc.) storm water runoff is directed to storm drain piping systems that direct <br />flow through the two large detention basins constructed on the western parcel and <br />central parcel. Although these detention facilities were constructed during Phase I <br />development of the site, they were sized to accommodate full future development of the <br />property. Areas that remain open land, similar to the natural condition of the property, <br />are allowed to flow directly to the storm drainage channels across the property, bypassing <br />the detention ponds. <br /> <br />A 6b Comment: <br />Kevin Close reported that at the Council meeting on the Specific Plan, an interest was <br />shown in permeable pavers for the parking lots as opposed to crushed granite; he <br />expressed concern for problems of groundwater contamination resulting from <br />parking lot treatment. <br /> <br />Response: <br />The comment indicates that there has been some interest shown in using a per- <br />meable paving solution for the project parking lots and expresses some concern <br />regarding the potential for groundwater contamination associated with the infiltra- <br />tion of pollutants through the permeable pavers. It should be noted that the DEI R <br />did not specifically recommend the use of permeable pavers in the parking lot. How- <br /> <br />6 <br />