My WebLink
|
Help
|
About
|
Sign Out
RES 06035
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2006
>
RES 06035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2006 4:17:08 PM
Creation date
6/7/2006 4:02:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/16/2006
DOCUMENT NO
RES 06035
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Response: <br />The City intends to continue to work closely with Zone 7 on all aspects of the project <br />that could affect regional flooding and flood control projects, <br /> <br />D 3 Comment: <br />In Zone Ts 2003 Well Master Plan, Zone 7 identified several potential areas, includ- <br />ing the Bernal Property, that can be utilized for development of new recovery wells to <br />keep pace with the increasing potable water demands within Zone Ts service area, <br />The potential impacts of constructing and operating wells on the Bernal Property <br />were analyzed in the Well Master Plan Environmental Impact Report (2005), and <br />found to not result in any significant environmental impacts, No reference was made <br />to Zone Ts Well Master Plan in the Bernal Property Phase II Specific Plan, <br /> <br />The Agency requests that the construction of one to two wells on the Bernal Property, <br />if needed, for water reliability be included in the "public utilities" section as a <br />"potentially permitted land use," <br /> <br />Response: <br />To provide for Zone Ts ability to recover imported water stored locally in the main <br />groundwater basin, it is recommended that "public wells" be added to the definition <br />of "Public Utilities" on p, 20 of the Specific Plan, <br /> <br />D 4 Comment: <br />If Zone 7 constructs a recovery well on the Bernal Property for water supply reliability <br />purposes, some of the project's water supply could come from an onsite source <br />some of the time, The Agency requests that text on p, 92 which currently states that <br />groundwater would be provided from an offsite source if the project uses <br />groundwater for a portion of its water supply, be revised to read: "",that groundwater <br />could be provided either from an onsite or offsite source," <br /> <br />Response: <br />The DEI R is hereby amended as suggested, <br /> <br />E. ALAMEDA COUNTY, <br />PUBLIC WORKSAGENCY <br />LETTER OF MARCH23, 2006 <br /> <br />E 1 Comment: <br />The proposed project as described in the DEIR misses an opportunity to integrate <br />transit oriented development that would facilitate both local and regional traffic <br />needs, The current population trends of the City and the greater region will continue <br />to place increasingly significant demands on resources into the future, There is <br />therefore, a definite need to anticipate and consider the impacts of such demand on <br />the future quality of life, <br /> <br />Response: <br />Comment acknowledged, <br /> <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.