Laserfiche WebLink
<br />Draft Environmental Impact Report <br />Bernal Property Phase II Specific Plan <br /> <br />3. Key Project Characteristics, Impacts, and Mitigation Measures <br /> <br />a. Key Project Characteristics <br /> <br />The Phase II Specific Plan area would be devoted to recreational, institutional, public, and <br />open space uses as described in the Specific Plan (see Chapter 2 and the use descriptions in <br />Appendix B of this EIR), <br /> <br />Portions of the property would be graded and/or excavated to prepare for the development <br />of specific uses, Other portions of the site may be excluded from grading, and may be used <br />in a manner for which disturbance of surface/subsurface soils would not be needed at all or <br />would be minimal. <br /> <br />b. Significance Criteria <br /> <br />Significance criteria for the proposed project's impacts on cultural resources are based on <br />criteria set forth in CEQA Guidelines (Appendix G (Items V (b), (c), and (d) (Item (a) is not <br />applicable in the absence of historical resources at the Phase II site) and Item XVII (a) is not <br />applicable because the project does not eliminate any examples of the major periods of <br />California history or prehistory, Impacts on cultural resources would be significant: <br /> <br />(1) [If the project would] cause a significant adverse change in the significance of an <br />archaeological resource pursuant to CEQA Guidelines ~15064,S, <br /> <br />(2) [If the project would] directly or indirectly destroy a unique paleontological <br />resource or site or unique geologic feature, <br /> <br />(3) [If the project would] disturb any human remains, including those interred outside <br />offormal cemeteries, <br /> <br />(4) [If the project would] eliminate important examples of the major periods of <br />California history or prehistory; <br /> <br />Development of lands included in the Bernal Property Phase I Specific Plan area was found <br />to have a potentially adverse impact on cultural resources through grading, excavation, <br />and/or construction activities, To minimize the risk of adverse impacts on cultural <br />resources, the Phase I Planned Unit Development (PUD) was conditioned to require: <br /> <br />. Completion of a cultural resources survey of the project site prior to the issuance of a <br />grading permit for either the Western Area or the Central Area (Condition 41); <br /> <br />Implementation of mitigation for sites that might be discovered during future survey <br />or monitoring activities (Condition 42); <br /> <br />Inclusion in the PUD of all feasible mitigation measures specified in the 1997/2000 <br />EIR, including provisions for the protection of cultural resources, which may include <br />"capping" (which would leave the site undisturbed; see text after Measure E2); and <br /> <br />Presence of a qualified archaeologist onsite during grading and site preparation acti- <br />vities, and discontinuance of land-disturbing activities within a 3s-foot radius if cul- <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />70 <br />