My WebLink
|
Help
|
About
|
Sign Out
SR 06:177
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:177
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2006 3:44:47 PM
Creation date
7/13/2006 3:42:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/18/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:177
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TASK 4 - PRELI~INARY PLANS <br />CONSULTANT shall prepare preliminary design plans and opinion of probable cost. <br /> <br />Task 4.1 Geometric Approval Drawings (Pavement Delineation Plan) <br />CONSULTANT shall prepare Geometric Approval Drawings (GAD) on the project base <br />map. Draft geometric approval drawings will consist of the following: <br /> <br />. Horizontal alignment <br />. Limits of grading <br />. Pedestrian and bicycle facilities <br />. Driveway access to adjacent property driveways <br />. Typical roadway sections for Old Stanley Boulevard <br />. Existing right of way lines <br />. Adjacent property parcel numbers, addresses, and property owners. <br /> <br />CONSULTANT shall submit the draft geometric approval drawings for CITY review. <br />CONSULTANT shall incorporate CITY review comments, prepare final GAD, and <br />obtain CITY approval prior to commencing with the preparation of the Plans, <br />Specifications and Estimates. <br /> <br />Deliverables: 5 copies of Draft Geometric Approval Drawings <br />5 copies of Final Geometric Approval Drawings <br /> <br />Task 4.2 Preliminary Opinion of Probable Cost <br />CONSULTANT shall prepare preliminary construction quantities and a preliminary <br />engineer's estimate of the project construction costs based upon the GAD. The cost <br />estimate will be general in nature, yet include the major construction items for the <br />pavement reconstruction, pavement overlay, curb, gutter and sidewalk, street lighting <br />removals and installations, and signing and striping improvements. <br /> <br />Task 4.3 Prepare Temporary Construction Easements <br />Task consists of defining the existing R/W along the street frontage, combining it with <br />the assessors parcel maps (to get approximate property lines between properties), and <br />preparing Temporary Construction Easement (TCE) drawings. <br /> <br />CONSULTANT shall perform Right of Way Engineering to locate the R/W line along <br />the street frontage for the homes and businesses on Old Stanley Boulevard within the <br />project limits. <br /> <br />CONSULTANT shall use assessor's parcel maps to determine the "approximate" <br />location of property lines between adjacent properties on Old Stanley Boulevard within <br />the project limits. . <br /> <br />CONSULTANT shall prepare the drawings to support the TCE's that will be presented to <br />the relevant property owners by the CITY. <br />
The URL can be used to link to this page
Your browser does not support the video tag.