Laserfiche WebLink
Project No. JB-5B9 <br />20 June 2006 <br />Page 6 <br />We understand that a septic tank system may be located on the property. <br />Information regarding the system should be forwarded to our office when <br />available for review so that we may determine whether the system needs be <br />removed. <br />6.1.2 Site Clearing <br />All grading must be observed by our representative. It is especially important that <br />our representative be present during the demolition, stripping and scarification <br />process to observe whether undesirable materials are encountered. Loose, soft, <br />uncontrolled fill, or disturbed native soils must be removed from all structural <br />areas, beneath adjacent walks and slabs, beneath areas to receive fill, and <br />beneath areas to be paved. Excavations must extend at least 5 feet beyond the <br />structure and slab areas, if practicable. The term uncontrolled fill refers to any <br />existing fill that was not properly inspected or tested by an engineering firm. <br />As previously stated, any uncontrolled fill at the site should be removed in <br />accordance with our recommendations. If testing and observation documentation <br />exists for suspected undocumented fill, the documentation should be forwarded <br />to our office for review. If the documentation is acceptable, we may allow the <br />fill to remain in place. <br />6.1.3 Excavations and Utility Trenches <br />As discussed earlier, stiff to very stiff silty clay and gravelly clay and medium <br />dense to very dense clayey sand and silty sand was encountered at the time of <br />drilling. We anticipate that the native soils may be excavated utilizing <br />conventional equipment. Contractors, especially those digging utilities, should <br />satisfy themselves as to the hardness of deposits and equipment required. If <br />construction requires personnel to enter the excavation, the contractor must <br />comply with the Occupational Health and Safety Administration regulations set <br />forth in 29 CFR 1926. <br />Utility trenches that parallel the sides of the buildings should be placed so that <br />they do not extend below a line sloped down and away at a slope of ZH:1 V <br />(horizontal to vertical) from the bottom outside edge of the perimeter foundations. <br />All trenches should be backfilled with native materials compacted uniformly to the <br />relative compaction specified in the following section. If local building codes <br />require use of sand as the trench backfill, all utility trenches entering the building <br />should be provided with an impervious seal of either cohesive soil or lean concrete <br />where the trench passes under the building perimeter. The impervious plug <br />should extend 4 feet into, and out of, the building perimeter. Jetting of trench <br />~Korbmacher Engineering, Inc. <br />