My WebLink
|
Help
|
About
|
Sign Out
16 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
030607
>
16 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2007 8:45:53 AM
Creation date
2/28/2007 4:30:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/6/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
16 Attachments
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. JB-569 <br />20 June 2006 <br />Page 7 <br />backfill is not recommended as it may result in an unsatisfactory degree of <br />compaction. <br />6.1.4 Fill Placement and Compaction <br />After performing the required excavations and/or prior to foundation excavations, <br />the exposed subgrade soil should be carefully inspected to verify removal of all <br />unsuitable deposits. The exposed subgrade soil should then be scarified to a <br />depth of 12 inches, moisture-conditioned, and compacted to a minimum of 90 <br />percent relative compaction at a minimum of 3 percent over optimum moisture <br />content according to the latest ASTM test methods and procedures. After <br />compacting the subgrade soil, all required fill should be placed in loose lifts a <br />maximum of 8 inches in thickness. <br />On-site soil generated by site grading may be used as structural fill provided the <br />soil is free of deleterious and organic materials and is approved for use as fill by <br />our representative. <br />Building Pad backfill should be compacted a minimum of 90 percent relative <br />compaction at a minimum of 3 percent over the optimum moisture content <br />according to the latest ASTM test methods and procedures. <br />General fill and trench backfill should be compacted to a minimum of 90 percent <br />relative compaction at a minimum of 2 percent over the optimum moisture <br />content according to the latest ASTM test methods and procedures. <br />The upper 12 inches of pavement subgrade soils should be scarified, moisture- <br />conditioned as necessary, and recompacted to a minimum of 95 percent relative <br />compaction. <br />If pumping subgrade soils are encountered, we recommend over-excavating to <br />firm, non-yielding soil and placing recompacted fill as recommended in Section <br />6.1 .4. If non-yielding soil is not encountered within 2 feet below the proposed <br />subgrade elevation, an acceptable option is to place a woven geotextile at the <br />base of the excavation and backfill with a granular material. The geotextile should <br />consist of Mirafi 500X or an approved equivalent. A test area should be prepared <br />to evaluate the performance of the method. If anon-yielding pavement subgrade <br />is not achieved, deeper excavation may be necessary. <br />Soils that are not pumping but are determined to be too wet to properly compact <br />may be prepared by ripping the soil and allowing the soil to dry, excavating and <br />replacing, or lime treating. <br />~Korbmacher Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.