Project No. JB-569 <br />20 June 2006 <br />Page 9 <br />or equivalent pipe installed on a bed of approximately 3 inches of drain rock. <br />Class 2 Permeable drain rock is and acceptable equivalent for drain rock and <br />geotextile. The subdrain must be placed at the heel (rear) of the keyway/bench <br />with perforations placed downward. The subdrain should be extended to an <br />acceptable outlet using unperforated pipe outside of the drain rock. All subdrain <br />and outlet drain pipe must be placed to fall at least 1 percent. <br />Fill placed within the keyway must be compacted to a minimum of 95 percent <br />relative compaction at a minimum of 3 percent over optimum moisture content. <br />Fill placed above the keyway or above benched areas must be compacted to a <br />minimum of 90 percent relative compaction. <br />The gradient of the exposed outboard surface of the fill must not exceed 2H:1 V. <br />Additional recommendations may be made for fill slope construction depending <br />on the soil conditions encountered. <br />6.2 Foundations <br />6.2.1 Conventional Foundation System <br />If the earthwork recommendations included in this report are complied with, the <br />proposed private residences may be supported by conventional foundations <br />established on compacted, engineered fill. Settlement of the proposed structures, <br />supported as recommended, should be less than 1 inch. Recommendations for <br />footing depths and foundation details are included in Table 3. <br />The excavations for footings must be cleaned of all loose materials and debris, <br />and moistened prior to placement of concrete. All footing excavations must be <br />observed by our representative to verify the condition of the bearing material. If <br />any localized areas of loose or soft undesirable subsoil are observed in footing <br />excavations, the excavation for the footings must be over-excavated to firm soil <br />and backfilled with compacted fill under the observations and testing of our <br />representative. <br />All footings should be reinforced with top and bottom reinforcement to provide <br />structural continuity and to permit spanning of local irregularities. The <br />reinforcement of the footing should be designed by a structural engineer. <br />If a different type of foundation system is desired, this office should be called for <br />supplemental recommendations. Such recommendations will be presented as an <br />addendum to this report. <br />ire Korbmacher Engineering, Inc. <br />