My WebLink
|
Help
|
About
|
Sign Out
16 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
030607
>
16 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2007 8:45:53 AM
Creation date
2/28/2007 4:30:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/6/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
16 Attachments
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. JB-569 <br />20 June 2006 <br />Page 11 <br />installing a subdrain system is not possible, the retaining walls should be designed <br />for full hydrostatic loading. We recommend that the foundation walls be <br />waterproofed. <br />The retaining wall drainage blanket should extend the full height of the wall to <br />within 12 inches of the top of backfill. The drain should consist of a minimum <br />thickness of 12 inches of drain rock surrounded by an approved non-woven <br />geotextile. Class 2 Permeable material is an acceptable equivalent for drain rock <br />and geotextile. A 4-inch perforated PVC pipe should be placed at the base of the <br />drain, bedded in a minimum of 2 inches of drain rock, the pipe should be installed <br />with the perforations facing down and sloped to drain at a minimum grade of 1 <br />percent. Outside of the drainage system, the drain should be extended with solid <br />pipe to an acceptable discharge point. <br />6.5 Concrete Slabs-on-Grade <br />If the earthwork recommendations are complied with, concrete slabs-on-grade <br />may be protected from unwanted moisture vapor by an underlainment of a 4-inch <br />thick capillary break of Class 2 drain rock, clean '/z by 3/<-inch crushed drain rock, <br />or pea gravel. Class 2 base rock may not be used as the capillary break. If the <br />potential for a damp slab is undesirable or if moisture sensitive floor coverings are <br />used, we recommend that a membrane of 10-mil minimum thickness be placed <br />on the drain rock and overlain by a minimum of 2 inches of clean sand to assist <br />in the proper curing of the slab. The select material or sand should be moistened <br />but not saturated prior to placement of concrete. <br />It should be noted that the intention of the membrane is to limit moisture <br />transmission through the slab, not to eliminate moisture transmission through the <br />slab. A membrane will not eliminate moisture transmission which can cause mold <br />growth. The membrane must be constructed properly to effectively limit moisture <br />transmission. Proper construction includes sealing the perimeter of the membrane <br />as well as all seams and penetrations. <br />If greater resistance to moisture transmission is desired, we recommend sealing <br />the slab with an approved concrete sealant. We also recommend reducing the <br />water-cement ratio of the concrete mix design for slabs as low as possible to help <br />further reduce the potential for moisture passing through the slab. The structural <br />engineer should determine the final requirements of the concrete mix design. <br />We recommend concrete slab-on-grade floors and exterior flatwork be a minimum <br />thickness of 4 inches. The actual slab thickness must be determined by the <br />project structural engineer. <br />~Korbmacher Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.