My WebLink
|
Help
|
About
|
Sign Out
13 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
071707
>
13 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2007 12:55:44 PM
Creation date
7/11/2007 11:56:59 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/17/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
13 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUD-65 Environmental Checklist <br />necessitating the construction of replacement <br />housing elsewhere? <br />Discussion <br />a-c) The subject property is surrounded by industrial, office, public cemetery, or nlral <br />residential uses. For this reason, staff would consider the proposed project to be an infill <br />development. Public streets and utilities including water, storm, and sanitary sewer lines, <br />and gas and electrical lines have been extended to the boundaries of the project area in <br />conjunction with other, nearby development. The intensity of the proposed project is <br />compatible with the development pattern of adjoining properties. The small-scale office <br />building would not induce substantial population growth in the area. The proposed <br />project would demolish an existing, dilapidated single-family home that is currently <br />vacant and not suitable for habitation. Therefore, this would be categorized as no- <br />impact. <br />13. PUBLIC SERVICES <br />Environmental Setting <br />The City of Pleasanton has public services and infrastructure planned to meet the build out of the <br />General Plan. <br />Standards of Significance <br />For purposes of this environmental document, an impact is considered significant if the proposed <br />project would: <br />• Create an increase in demand for police protection services which could substantially <br />interfere with the ability of the Police Department to provide adequate response time to <br />the project site; <br />• Create an increased demand for fire protection services that would substantially interfere <br />with the ability of the Fire Department to provide adequate response time to the project <br />site; <br />• Create an increased demand for schools that would exceed existing school capacity; or, <br />• Create an increased demand for parks and other public facilities that would exceed <br />existing capacity. <br />Less Than <br />Potentially Sip iticant Less Than <br />Significant With Mitigation Significant No <br />Issues Impact Incorporated Impact Impact <br />Public Services <br />Wozclcl the project: <br />a) Would the project result in substantial adverse ~ ~ ~ ^X <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.