My WebLink
|
Help
|
About
|
Sign Out
WINKO-MATIC SIGNAL
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
W
>
WINKO-MATIC SIGNAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2007 11:47:33 AM
Creation date
11/5/2007 11:20:14 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
5/19/1987
LONG TERM AGREEMENTS - NAME
WINKO-MATIC SIGNAL
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 hour period. The number of actuations registered for each <br />detector, in programmable time increments of not less than 15 <br />minutes, shall be continually logged and printed out at the end <br />_ __ of the 24 hour period. _ ____ __ _ <br />TRAINING. Within 10 working days after acceptance of equipment, the <br />Contractor shal l submi t a proposed plan for training operations and <br />maintenance personnel. Dates, schedules and location of training site <br />shall be mutually agreed upon by the Contractor and the Engineer. <br />Training shall be provided consisting in general of 3 parts as follows: <br />~~` a (1) System Operations and Master Programming. A minimum of 40 hours <br />~ training s a e prove a or operations personnel on the <br />.~~ procedures involved i n selecting and changing system operating <br />~' conditions and in programming the computer. This course shall be <br />+~ geared toward individuals r+ith a basic knowledge of electronics and <br />traffic signal operation. Hands-on experience in programming shall <br />be included. <br />(2) System Maintenance and Trouble shooting. A minimum of 40 hours <br />raining s a prove or main enance personnel in maintenance <br />and diagnostics of the system, the intersection controller <br />assemblies and the surveillance assemblies. <br />{3) Combined Operation and Maintenance Follow-up. A minimum of 40 <br />ours s a prove or main enance a operations personnel in <br />combined operation and maintenance follow-up training shall be <br />provided after installation of the system but before expiration of <br />the guarantee period. This course will be informally presented <br />with emphasis on filling in training areas not covered previously <br />or fully understood. This training need not be presented <br />continuously but may be requested for short intervals as needed by <br />operations and/or maintenance personnel. <br />The training courses shall be taught by experienced instructors at <br />a site provided by the Contractor. Training facilities shall be <br />provided for 20 trainees at each session. The Contractor shall <br />provide all instructors and instructional materials including at <br />least workbooks, guides, training aids, systems and controller <br />technical manuals, master and an intersection margin release <br />control 1 er of the same type and model to be i nstal 1 ed, a rni al l <br />other necessary materials for up to 20 trainees. <br />Training sessions (1) and <br />for a minimum of six hours <br />unless otherwise approved <br />(2) above shall be conducted continuously <br />each working day until course conclusion <br />by the engineer. _ <br />Intersection Control <br />It shall be possible for the operator to select the following modes <br />of operation for any intersection under computer control at the master. <br />-13- <br />
The URL can be used to link to this page
Your browser does not support the video tag.