My WebLink
|
Help
|
About
|
Sign Out
DUBLIN, CITY OF 1982
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
D
>
DUBLIN, CITY OF 1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2008 9:36:34 AM
Creation date
11/8/2007 4:34:28 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
12/27/1982
LONG TERM AGREEMENTS - NAME
DUBLIN
LONG TERM AGREEMENTS - TYPE
STREET IMPROVEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
traffic signals generally in accordance with the conceptual <br />drawing as shown in Exhibit "A" (the "Project"). In furtherance <br />thereof, Dublin agrees to do the following: <br />a. .Conduct an appropriate environmental assessment <br />and provide such documents as may be necessary <br />in conformance with the California Environ- <br />mental Quality Act. <br />b. Cooperate with and assist Pleasanton in <br />processing the Project application through <br />the Caltrans review and approval process. <br />c. Review and approve Project plans and specifications. <br />d. Inspect the construction of Project as required, <br />unless this function is delegated to Pleasanton. <br />e. Authorize Pleasanton to enter into an agreement <br />with Caltrans concerning distribution of <br />maintenance and operation costs, or, if the <br />former is infeasible, enter into such an <br />agreement with Caltrans directly, including, <br />if possible, direct billing of Pleasanton for <br />such costs. <br />2. Responsibilities of Pleasanton. Pleasanton agrees <br />to construct the Project and, in furtherance thereof, agrees <br />to do the following: <br />a. Prepare all engineering plans, specifications <br />and estimates for the Project, including such <br />Project modifications which may be required <br />by Dublin and/or Caltrans as a result of their <br />review thereof. <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.