My WebLink
|
Help
|
About
|
Sign Out
15 ATTACHMENT 9
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
031808
>
15 ATTACHMENT 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2008 1:56:39 PM
Creation date
3/14/2008 4:54:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/18/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
15 ATTACHMENT 9
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. 9929.G Geotechnical Investigation/Vineyard Avenue, Pleasanton 8 August 2003 <br />23. Fill slopes must be compacted as the filling operation progresses by (1) using sheepsfoot- <br />type rollers in conjunction with proper moisture conditioning, or (2) over-constructing the fill <br />slopes and cutting back the looser surface soils to a firm and adequately compacted design slope <br />grade. Track-walking of slope surfaces does not provide adequate soil densities and is an <br />unacceptable method of slope compaction. <br />24. Cut and fill slopes may experience severe erosion when grading is halted during rainy <br />weather. Before work is stopped, a positive gradient away from the slopes must be established to <br />carry the surface runoff water away from the slopes to areas where erosion and sediment can be <br />controlled. <br />25. After completion of the slope grading, erosion protection must be provided. Slope <br />planting, preferably with deep-rooted native plants, must be completed on all exposed surfaces of <br />cut and fill slopes. Graded slopes should not be left exposed through a winter season without the <br />completion of erosion control measures and slope planting. <br />Surface and Subsurface Drainage <br />26. The slope gradients are based on strength characteristics of the materials under conditions <br />of normal moisture content that would result from rain water falling directly on the slope but do <br />not take into consideration the additional seepage forces from springs or subsurface water areas. <br />Areas of observed seepage, as discovered during grading operations, should be provided with <br />subsurface drains below the surface of the slope as directed by the Soil Engineer. Subsurface <br />drainage facilities may include gravel blankets, rock-filled trenches, or horizontally-drilled <br />drains. <br />27. No ponding of storm water is to be permitted on the building pads during prolonged <br />periods of inclement weather. <br />TERRASEARCH, inc. Page 18 of 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.