Laserfiche WebLink
Project No. 9929.G Geotechnical Investigation/Vineyard Avenue, Pleasanton S August 2003 <br />20. It is noted that since a significant cut is proposed at the estate lot, shrinkage or expansion of <br />the excavated soils is very important. Once the additional boring is performed an evaluation of <br />shrinkage /swell will be made at that time. <br />Cut/Fill Lots <br />21. Due to the nature of the site and the anticipated grading, it is expected that some of the <br />building pads will be created by cut and fill. Depending on the thickness of the cut or fill, the <br />building subgrade will vary from native soil or bedrock in the cut area to engineered fill. The <br />pad grade will therefore consist of variable engineering characteristics and in an attempt to create <br />a near uniform pad grade for support on a slab type foundation, it is recommended that the cut <br />portion be overexcavated such that the maximum fill thickness differential is no greater that 5 <br />feet. After overexcavation, the exposed surface should be prepared to receive fill as discussed <br />above, and the material recompacted as engineered fill. If a pier and grade beam foundation is <br />used then subexcavation of the cut areas is not needed. Additional recommendations will be <br />made as necessary in the field by the Soil Engineer. <br />Slopes <br />22. It is recommended that all unsupported cut and fill slopes less than 30 feet in height be <br />constructed at inclinations no steeper than 2:1 (horizontal to vertical). Fill slopes greater than 30 <br />feet in height should be inclined no steeper than 2.5:1. The subsurface materials that will form <br />the 50 foot cutslope planned for the estate lot is not known, but is anticipated to be Livermore <br />Gravel bedrock material, and the cut slope is expected to be preliminarily stable at an inclination <br />of 2.75:1. This will be confirmed during grading or prior to grading when access for a drill rig is <br />available. All cut slopes should be rounded at the upper extremities. Furthermore, it is <br />recommended that all cut slopes in excess of 5 feet in vertical height be observed by the <br />Engineering Geologist during the grading operations. <br />TERRASEARCH, inG Page 17 of 53 <br />