My WebLink
|
Help
|
About
|
Sign Out
15 ATTACHMENT 9
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
031808
>
15 ATTACHMENT 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2008 1:56:39 PM
Creation date
3/14/2008 4:54:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/18/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
15 ATTACHMENT 9
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. McInnis: Yes. If we could get to that master plan, I'd like to show you that. We would start <br />our fill right here at the old vineyard, come up and the terrace all the way up, about a <br />third of the site, all vineyards. And then the vineyards were going to crawl up along the <br />road also. A lot of the vineyards could not be grown under the oaks, but we can get them <br />wrapping around, too. <br />Commissioner Fox: I have two questions for Lynn and Donna -one might take a little research. <br />First of all, you have the Municipal Code there. One of the things I wanted to find out is <br />if the cupola the same as what we define as a turret in the Municipal Code, and if that's <br />the case, do we include that in the building height? The reason I ask is because there was <br />recently aone-story house with a turret that was approved on Dennis Drive near Newton <br />Way, and I cannot remember whether or not that was included in the building height in <br />the Municipal Code. So, would you clarify that, and then clarify what the height of the <br />building is according to how it is calculated in our Municipal Code, and whether turret <br />equals cupola or not, or whether it is the flat roofline? <br />The second question I had is, I've been on the Commission for two years, and I need <br />some staff guidance here. The last time we talked about dots, and whether dots really <br />meant the general location or the exact location, was the issue we had with the North <br />Sycamore Specific Plan when we were talking about the trail or the path or the sidewalk <br />through the Bozorgzad property. We had the issue about the dots and whether the dots in <br />the Specific Plan meant the alignment of the trail or the general designated area of a <br />location, around which the proximity of the trail should be located. So, could staff give <br />some guidance in terms of the Specific Plan, and whether the dot means the specific <br />location, based upon previous cases that have come to the Commission and staff, or <br />whether the dot means a general location, similar to the North Sycamore Specific Plan? <br />Ms. Lynn Tracy Nerland: As to the definition of the dot, you are talking about a project that <br />came before Donna, so that is not something Planning feels prepared to speak about. <br />Chairperson Maas: That's fine. You can get back to us on those two items. <br />Chairperson Maas: Could you give me your comments on the peer review, or comments <br />regarding the photo montage that was submitted? <br />Mr. MacDonald: We contacted the City before we retained the peer reviewer acceptable to the <br />City. That peer reviewer was asked to come out when all of the original photographs <br />were taken. So, some of the comments that came back from the peer reviewer were <br />somewhat surprising because he was present when the original set of photographs were <br />taken. One of the interesting things was, the peer review quoted a price which was more <br />than what a photo montage peer review was. We inquired as to how a peer review could <br />cost more than somebody who is actually doing the photo montages and the work and all <br />the computer work, and we were informed that the peer reviewer actually wants to create <br />his own model. He basically does a parallel model so that he can compare it to make sure <br />that the other model is correct. Our peer reviewer said that was fine, but asked if the peer <br />reviewer would also take a couple of hours and come with our peer reviewer while he is <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.