My WebLink
|
Help
|
About
|
Sign Out
RES 86171
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1986
>
RES 86171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2012 4:33:50 PM
Creation date
12/14/1999 11:07:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/15/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
start of construction. This should include the <br /> requirement to contact Underground Service Alert. (800-642- <br /> 2444) <br /> <br /> 3. Responsibility of the Contractor to contact the City of <br /> Pleasanton Inspection Department at (415) 847-8195 to <br /> arrange for pre-construction conference, if so required by <br /> the City Engineer, prior to the start of construction. <br /> <br /> 4. Setting of construction stakes by a surveyor under the <br /> supervision of a Licensed Land Surveyor or a Registered <br /> Civil Engineer for any Sanitary Sewer pipe so required by <br /> Section D, page 14, of this manual. <br /> <br /> 5. Haul Route - Route shall be specifically described by <br /> street names, beginning with 1-580 or 1-680 and ending with <br /> street adjacent to project site. <br /> <br /> 6. Responsibility of the contractor to contact Alameda <br /> County Flood Control District Zone 7 at (415) 443-9300 for <br /> instructions regarding any wells encountered during <br /> construction. <br /> <br /> 7. All construction to be in conformance with the <br /> requirements and specifications of the City of Pleasanton. <br /> <br /> 8. Verification of finished floor elevations by a Civil <br /> Engineer or Land Surveyor prior to occupancy. <br /> <br />I. Erosion and Sedimentation Control Plan: <br /> <br /> 1. Plan: An erosion and sedimentation control plan must <br /> be done for all projects. Erosion control measures must <br /> meet the requirements specified in the most current ABAG <br /> Erosion and Sedimentation Control Manual, which is available <br /> from ABAG at 101 8th Street in Oakland. - <br /> <br /> If the proposed erosion control measures can be adequately <br /> described by reference to City Standard Drawings No. Priv.-6 <br /> 7, and 8, a separate plan sheet need not be done. Reference <br /> to these standard drawings and Erosion Control Notes can be <br /> placed on the Grading Plan. If, however, in the opinion of <br /> the City Engineer, locations or details of erosion control <br /> appurtenances cannot be adequately described in notes, a <br /> separate Erosion Control Plan must be prepared. The Design <br /> Engineer should consult the City Engineer regarding the need <br /> for a separate Erosion Control Plan prior to commencing <br /> preparation of project plans. <br /> <br /> 21 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.