My WebLink
|
Help
|
About
|
Sign Out
11
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
091608
>
11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2008 4:39:32 PM
Creation date
9/9/2008 4:39:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/16/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fehr & Peers then completed a transportation study for incorporation into an EIR that evaluated seven <br />intersections for both the weekday and weekend conditions. These intersections were evaluated under existing, <br />existing plus project, and cumulative (year 2030) with and without project conditions. The ACCMA analysis was <br />completed for several state highway segments. The site plan review was completed with specific attention to <br />pedestrian flow patterns; bicycle access and parking; automobile circulation and parking; and delivery truck <br />access. <br />This was a highly controversial project with a lot of community opposition from the adjacent neighborhoods, and <br />support from the larger community. The EIR for this project was certified, and the project is currently under <br />construction with expected opening in late 2008. <br />Kaiser Permanent Oakland Medical Center Replacement Project, (Oakland, CA) <br />The Kaiser Permanente Oakland Medical Center contains several buildings located near the corner of Broadway <br />and MacArthur Boulevard in Oakland, California. Kaiser obtained approval of a Medical Center Master Plan that <br />will result in replacement of a large part of the existing Medical Center and the addition of the Cancer Care <br />Center, new hospital tower and new parking facilities over the next 15 years. To continue to provide uninterrupted <br />services at the Medical Center, construction and demolition activities will be occur in three (3) phases between <br />2005 and 2014. <br />Fehr & Peers evaluated the impacts of the proposed Master Plan on the surrounding transportation system for <br />inclusion in the environmental impact report. A unique trip generation approach was used to determine the net- <br />added traffic, incorporating traffic generated by the new uses and traffic reductions due to replaced uses and <br />transit access to the site. Zip code data for Kaiser Staff, physicians, and members was used with Geographic <br />Information Systems (GIS) to determine trip distribution. Trip assignment was conducted both on macroscopic <br />(new trips to the site) and microscopic (changing traffic patterns within the site) scales. Changing pedestrian flows <br />were also evaluated as the Master Plan includes pedestrian bridges between buildings. <br />The transportation impacts analysis was conducted with input from City staff, to ensure that it would meet the <br />City's requirements. It was also conducted according to Alameda County Congestion Management Agency (CMA) <br />guidelines. The EIR for this project has been certified, and the first phase is under construction. <br />Fehr & Peers continues to work with Kaiser and City Staff to design traffic engineering elements, and coordinate <br />design efforts with respect to automobile, bicycle and pedestrian traffic through the area during and after <br />construction. <br />Oak to Ninth, (Oakland, CA) <br />Fehr & Peers studied the impacts on the transportation network for the Oak to Ninth Project in Oakland, <br />California. The project is a mixed-use consisting of 3,100 dwelling units and 200,000 square feet of commercial <br />space along the Oakland Estuary. Fehr & Peers worked with the Project Applicant, the Architect, and the City to <br />develop a street grid system to accommodate the project's traffic. Coordination with Caltrans was necessary <br />because to project access roads were proposed opposite Caltrans freeway ramps. A traffic and railroad <br />simulation model was required to assess the project's traffic impact at an active at-grade rail crossing. <br />An environmental impact report (EIR) was prepared for the project. Fehr R Peers prepared the traffic analysis for <br />this study which addressed the components of a multi-modal transportation network across multiple scenarios <br />including Existing, 2010, and 2025 with and without project traffic. The analysis included a study of project <br />impacts on 52 intersections and freeway sections. The analysis assessed transit impacts, construction traffic <br />impacts, a review of the project design, and parking. Impacts were assessed using the significance criteria <br />s <br />
The URL can be used to link to this page
Your browser does not support the video tag.