My WebLink
|
Help
|
About
|
Sign Out
09 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
021709
>
09 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2009 1:21:44 PM
Creation date
2/12/2009 4:35:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/17/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
09 ATTACHMENTS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> <br />Steve Otto <br />From: nancy alien ~ <br />Sent: Sunday, July O6, 2008 11:44 PM <br />To: Steve Otto <br />Subject: RE: Ponderosa meeting tomorrow night at Planning commission <br />Steve, <br />I will not be able to attend the planning meeting this Wed. and would appreciate if you could include my <br />comments in the record for the Planning Commission. Thank you. <br />Nancy Allen <br />I do not support moving forvvaM with the Ponderosa expansion at this time for 3 reasons: <br />1) On a macro level, the traffic study shows that adding these homes will make traffic even worse (over 500 more <br />trips/day) on a road that is already at unacceptable levels in the p.m. and challenged in the a.m. This is a major <br />commute road for thousands of residents and workers a day. A couple seconds here and there for over 10,000 <br />residents/workers each day using this road does make adifference - 2,000 hours of lost timetyear. To approve <br />more homes in an area with already unacceptable traffic delays and not a defined circulation solution in the near <br />term does not appear fair or responsible. Please build the necessary infrastructure first before adding more <br />houses. <br />Suggest: Let's wait until the GP and SDE timing is better defined and consider this project at such time that we <br />know we will have a circulation plan that can support it. We should not be adding more development that adds <br />more traffic to Valley and Santa Rita without first having a SDE and a Busch extension to Valley in place. <br />2) Pleasanton has a very limited number of new homes that can be developed to achieve buildout. To add 110 <br />homes in advance of having the gameplan for buildout seems premature. Especially when we know there <br />may be major buildout requests around the corner with the quarry sale. We recommend that the Planning <br />leadership and Council first develop the gameplan for the remaining buildout which should be part of the GP <br />(rst. It does not seem right to make short term decisions like this in advance on upcoming longer term <br />decisions as this could suboptimize our city economics and planning process. <br />3) On a more tactical level, I question how far, if at all, this development helps Pleasanton's senior housing <br />needs (as this project appear to be positioned as helping senior housing). Not sure that we need specialized <br />senior housing of this type that is in a gated community (gated communities frequently have challenges with <br />emergency access), not near public transportatiomor next to a hospital, sizable 2 car garages, and likely over <br />$1 M per home. <br />Again if the goal is to increase senior housing, let's step back and make sure we have the right development <br />in place to meet the very limited housing starts that we can provide under our housing cap. <br />you for your consideration. <br />Nancy Allen <br />
The URL can be used to link to this page
Your browser does not support the video tag.