My WebLink
|
Help
|
About
|
Sign Out
RES 09268
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2009
>
RES 09268
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2010 5:12:10 PM
Creation date
2/25/2009 3:24:24 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/24/2009
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES 09268
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />As specified in the September 2007 Pre Development and Cooperation Agreement <br />between Vulcan Materials, Livermore, Pleasanton, Alameda County, and the ACSPA, <br />improvements to El Charro Road, if not already completed by the City of Livermore for <br />the El Charro Specific Plan development, would also need to be constructed by the <br />ASCPA (under the Development Agreement with the City of Pleasanton) as part of any <br />first phase of Staples Ranch development. Similarly, as permitted under the September <br />2007 Cost Sharing Agreement between Livermore, Pleasanton, and the ACSPA, the <br />Livermore flood control improvements planned for the El Charro Specific Plan, if not <br />already completed by the City of Livermore, would also need to be constructed by the <br />ASCPA as part of any first phase of Staples Ranch development. <br />In general, all public street and infrastructure improvements within and adjacent to <br />Staples Ranch would need to be constructed as part of the first phase of development. <br />The only exception would be if the Continuing Care Community site were to develop <br />first, and the Auto Mall, Retail/Commercial, and Community Park sites were to be <br />delayed. Under this scenario, full improvement to Auto Mall Place could be delayed <br />until one or more of the development sites requiring access from it was being developed, <br />as long as an emergency vehicle access were provided along the Auto Mall Place <br />alignment from El Charro Road to Stoneridge Drive. <br />The timing of the extension of Stoneridge Drive as a full four lane arterial, with turn <br />lanes, to El Charro Road is in Pleasanton's sole control, and is not required prior to any <br />phase of Staples Ranch development. The Stoneridge Drive extension will require the <br />replacement of the intervening EVA between Stoneridge Drive and Auto Mall Place with <br />a four lane road with tum lanes, as well as the construction of a second two lane bridge <br />across the Arroyo Mocho and widening of Stoneridge Drive to four lanes with turn lanes <br />from Trevor Parkway. Traffic lights would also be required to be installed at the <br />intersection of Stoneridge Drive and the public road to the Continuing Care Community <br />and at existing Stoneridge Drive intersections to the west. <br />C. Financing of Public Improvements <br />The 1989 Stoneridge Drive Specific Plan included a discussion on financing of public <br />infrastructure improvements within the 293 acre Specific Plan Area to be paid for largely <br />by Specific Plan property owners, including the Arroyo Mocho flood control <br />improvements, dedication of right of way, and extension of Stoneridge Drive as a four <br />lane arterial from Kamp Drive to El Charro Road, improvements to El Charro Road, <br />improvements to the I- 580/El Charro Road interchange, dedication of an elementary <br />school site, and dedication and improvement of several neighborhood parks and the <br />Stoneridge Drive Specific Plan Amendment/Staples Ranch <br />Draft October, 2008 <br />59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.