Laserfiche WebLink
B.1.a /b <br />(1 Point) <br />Identify the types and quantities of materials generated at the job site and reuse or <br />recycle at least 50% (per the checklist requirement) of the construction debris, <br />including green waste. A condition of approval will likely be added to the project to <br />reflect that a minimum of 75% be achieved. Staff encourages that the <br />applicant/property owner strive to achieve B.1.c (80 as points cannot be achieved <br />for meeting 75 <br />No matter the percentage achieved, spaces for recycling bins and containers on the <br />job site shall be allocated as well as trainvng workers on the use of the <br />bins /containers. Establish and use a cut -pile to reduce waste from scrap pieces of <br />wood, drywall, roofing and siding. Separate green waste from other materials. <br />Contact the California Integrated Waste Management Board at www.ciwmb.ca.gov <br />for more information on recycling facilities. The following percentage thresholds <br />include green waste: <br />Minimum 50% Waste Diversion by Weight (Recycling or Reuse) (Required) <br />Minimum 65% Waste Diversion by Weight (Recycling or Reuse) 2 Points <br />Minimum 80% Waste Diversion by Weight (Recycling or Reuse)2 Points <br />Submit documentation showing the waste diversion level. Documentation can <br />include waste tags or a summary of waste tags showing total waste diversion. <br />C.10.a This point is applicable on all shingle roofs only. The additional requirement for a <br />"Class A" fire rating is applicable anytime roofing materials are specified. The "Class <br />A" fire rating is achieved through the roofing material itself or through the roof <br />assembly as a whole. Shingle roofing shall carry a 3 -year subcontractor guarantee <br />and at least a 20 -year manufacturer's warranty (required for all projects). This <br />requirement is met if there are no shingle roofs. <br />Provide a copy of the manufacturer's warranty and subcontractor guarantee (if <br />shingle roofing is used). <br />D.9.a This point is a condition of approval for all residential projects. <br />Allow adequate space is required for the generation system. For PVs, this requires <br />a clear roof area (without penetrations) of roughly 100 to 150 square feet for each <br />kilowatt of power. Reserve space in mechanical rooms for system components. <br />Plan for adequate infrastructure (conduit runs and space in mechanical rooms) to <br />supply a system in the future. Install 3/4 -inch or larger conduit with pull boxes as <br />needed to run wire from the roof to junction boxes near the main panel and meter. <br />Consider adding hose bibs on the roof for easy washing of the panels. <br />Plan notes and an inspection from the Building and Safety Division shall be required. <br />Civic Square Apartments 2 of 14 Multifamily GreenPoint Comments <br />4800 Bernal Avenue PUD- 84- 21. -01M <br />